Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Davis
EV charger installation in Davis typically runs $850-$1,800 for a standard Level 2 setup, and most jobs are done in one visit. If your home sits on a larger lot with a detached garage or workshop, you’re probably looking at a longer wire run and possibly a panel upgrade, which pushes the cost to $2,500-$4,500. We know Davis electric systems better than most because we see the same ranch-era panels and tule-fog load spikes week after week. Call (877) 550-6892 and we’ll give you a straight number before we ever send a truck.
Why Gus’s Solar Is Davis’s Preferred EV Charger Installation Company
Gus Petrakis started this business in 2011 and put his own name on the truck. That matters in Davis, where a lot of folks have been burned by out-of-state outfits that quote one price on the phone and another at the door. Our crew does the work directly. No subs, no strangers wandering your property. Davis customers call Gus’s Solar because when something goes wrong, the same person who did the install answers the phone. Live person, 24/7. Not a voicemail tree.
Response time to Davis is usually same-day or next morning. We keep common parts for Davis’s housing stock on the truck: breakers for old Square D and Zinsco-style panels common in 1960s ranch homes, heavy-gauge wire for long runs to detached garages, and load-management gear for workshops. That means fewer follow-up visits. For homeowners between 50 and 70 who’ve dealt with national installers that vanish after the paperwork clears, the difference is simple: we live here, we work here, and you’ll see us at the Nugget or the hardware store. We don’t rush you, either. Take two weeks. The price will be the same.
Our EV Charger Installation Services in Davis
Here’s what we actually do for Davis homes. If your situation doesn’t fit neatly into one of these buckets, call us. We’ll figure out the right approach.
Level 2 Charger Installation
Most Davis homes get a 240-volt Level 2 charger that adds 25-30 miles of range per hour. We handle the circuit, the breaker, the mounting, and the charger setup. If your home was built in the 1960s or 1970s with a 100-amp panel, we’ll run a load calculation first. Older ranch homes in North Davis and East Davis often can’t take a 48-amp continuous draw without tripping the main during winter mornings when the heat pump, the car charger, and the coffee maker all compete for power.

Tesla Wall Connector Installation
Tesla owners in Davis choose the Wall Connector for its speed and clean look. We install these in garages, carports, and on exterior walls near driveways. The key with Tesla chargers is wire sizing over distance. On acreage properties off Pole Line Road or County Road 98, a detached garage 80 or 100 feet from the main panel needs heavier wire than a typical city lot. Get that wrong and the charger faults out on voltage drop. We get it right the first time.

Panel Upgrade for EV Charging
If your Davis home still runs on a 100-amp service, adding an EV charger usually means upgrading to 200 amps. That’s a $2,200-$4,000 job depending on your meter location and whether the utility needs to change the drop. Davis’s municipal utility requires pre-approval for chargers drawing over 32 amps, so we handle that paperwork before we pull the permit. Skip the approval and your install gets flagged at true-up review. We’ve seen it happen. Don’t let it happen to you.

Garage & Driveway Charger Wiring
Long wire runs to detached garages and workshops are the single biggest source of failed installs in Davis. A 48-amp charger needs 6 AWG copper or heavier over 100 feet. Using thinner wire causes voltage drop, overheating, and charger shutdowns. We pull the right conductor, install a subpanel where needed, and add load-shedding contactors so your charger automatically throttles when the irrigation pump or air compressor kicks on. One trip, done right.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Davis
We install and service chargers from Tesla, ChargePoint, Wallbox, Emporia, and ClipperCreek. For solar-paired EV charging, we work with EV Charger Installation systems built on Enphase and SolarEdge inverters, plus panels from Qcells, Panasonic, and REC. Davis customers sometimes ask about SunPower, and we service those systems too. We keep common breaker types and wire sizes stocked for the ranch-era panels we see across 95616, 95617, and 95618, which means faster turnarounds and fewer return trips.
Common EV Charger Installation Problems We See in Davis Homes
- Panel overload on acreage properties: A homeowner plugs in the charger while the irrigation pump is running and the meter socket shorts. Older 100-amp services were never built for a 48-amp continuous draw plus a well pump plus a heat pump. We add load management or upgrade the panel so it can’t happen.
- Voltage drop to detached workshops: Davis has dozens of 1960s and 1970s ranch homes with detached garages 80 to 150 feet from the main panel. Run 8 AWG wire for a 48-amp charger and the voltage drops below 208V, causing the charger to fault. We size wire for distance, not just amperage.
- Unapproved utility interconnections: Davis’s municipal utility wants pre-approval for chargers over 32 amps. Skip it and your true-up statement review flags the install. We file the paperwork before we pull wire.
- Tule-fog production dips on solar-paired setups: From November through February, persistent tule fog suppresses rooftop solar output. If you’re charging an EV off panels, you need a realistic winter yield estimate, not a brochure number. We quote actual winter production, because that’s when you’ll actually plug in most.
Pricing for EV Charger Installation in Davis, CA
Here are honest numbers for the Davis market. A Level 2 charger install on a home with a 200-amp panel and a short wire run runs $850-$1,400. A Tesla Wall Connector in a detached garage 100 feet from the main panel typically lands at $1,800-$2,600 with heavier wire. A full panel upgrade from 100 to 200 amps is $2,200-$4,000, depending on whether the municipal utility has to change the drop. Solar-paired EV charging, where we size the inverter and charger together, usually adds $600-$1,200 to the charger cost if the solar is already in place. Every quote is built from your actual panel, your actual wire run, and your actual utility bill, not a generic brochure figure. Estimates are free. Call (877) 550-6892.
We Also Serve Cities Near Davis
Our crews run routes to Dixon, Woodland, West Sacramento, and Winters every week, so we can schedule Davis-area appointments without long wait times. If you’re in one of those communities, our Davis service area reaches you too. Same pricing, same crew, same live person on the phone.
Serving Davis, CA - Our Local Coverage Area
We’re based in the Davis area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Davis
Yes. Davis requires an electrical permit for any new 240-volt circuit, and the municipal utility requires pre-approval for chargers drawing over 32 amps. We handle the permit and the utility paperwork as part of the install. That’s what you’re paying for when you hire a licensed contractor instead of a handyman.
Usually yes, but the load calculation has to be verified. Mace Ranch homes built in the 1990s often have 200-amp services with adequate headroom for two chargers, but the math depends on your heat pump size, your water heater type, and whether you have a pool or workshop load. We run the numbers before we quote. No guesswork.
Davis’s municipal utility credits excess solar at avoided-cost rates, not full retail, which means the financial case for solar-paired EV charging depends heavily on charging during daylight hours when your panels are producing. We size systems so the charger draws direct from the array when possible, and we give you a year-one production estimate that reflects winter tule fog. For most Davis households, charging an EV off rooftop solar still beats buying utility power by a wide margin, but the math changes if you charge mostly at night. Call (877) 550-6892 and bring a utility bill. We’ll show you the real numbers.
Yes, measurably. November through February, persistent tule fog suppresses rooftop production by 30 to 50 percent compared to summer. That doesn’t make solar-paired charging a bad investment, but it does mean you can’t quote a summer peak and call it a year. We quote winter yield, because that’s the honest number for an EV owner who plugs in every night. Most Davis solar owners still charge for pennies per mile over the year, but the payback math needs to use real fog-season data.
If your existing system pre-dates NEC 2017 rapid shutdown requirements and we’re adding a new circuit, Davis inspectors will typically ask us to bring the inverter up to current code. That means adding module-level power electronics or replacing the inverter. It’s an extra $800-$1,500 most homeowners don’t expect. On a mid-2000s CSI-era system in Davis, this is common. We flag it before we touch anything, so the number we quote is the number you pay. Get a free estimate: (877) 550-6892.
One Trip, No Callbacks. That’s How We Do It in Davis.
Davis is different from Woodland or Dixon. The older ranch homes on the west side, the 1990s subdivisions in Mace Ranch, the acreage properties off Pole Line Road and County Road 98: each has its own electric quirks. We know which panels can take a 48-amp charger and which need an upgrade. We know which detached workshops have 70-amp feeders that’ll trip the main when the compressor kicks on. And we know tule fog kills winter solar production, so we don’t quote summer numbers and pretend they’ll hold.
Bring us a utility bill. We’ll bring the math. And if you need two weeks to think about it, take them. The price won’t change. That’s the 90-Day Done Right Promise: if it’s not right, Gus makes it right. In writing. All you have to do is call (877) 550-6892.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Davis since 2011.






Before
After
Before
After
Before
After