Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable Solar Panel Installation Across Clovis
Solar panel installation in Clovis runs $16,500 to $34,000 before incentives for a typical 6-10 kW rooftop system, and most jobs take two to four weeks from signed contract to utility approval. We are Gus’s Solar, owned by Gus Petrakis, and we have crews working in Clovis neighborhoods every week-from the tree-lined streets off Temperance Avenue to the newer tracts in the 93619 side of town. Call (877) 550-6892 and a live person answers, day or night, not a call center.
Key takeaways:
- Clovis is PG&E territory under NEM 3.0, so export credits are roughly 75% lower than retail rates-your array has to be sized to afternoon load, not just total annual usage.
- Most Clovis rooftops are concrete tile or Spanish clay tile. We flash every penetration properly and never crack a tile to save ten minutes.
- Gus’s crew does the install. No subs. Background-checked, uniformed, and accountable to Gus himself.
- Every job carries our 90-Day Done Right Promise in writing. If something is not right, one call brings Gus back.
Why Gus’s Solar Is Clovis’s Preferred Solar Panel Installation Company
Gus Petrakis founded this company in 2011 and put his own name on the truck. When a Clovis homeowner calls, they talk to someone who has driven those streets-down Willow Avenue in 93611, out Barstow toward Harlan Ranch in 93619, past the new builds going up every year on the city’s east side. We know what a Clovis roof looks like when it is ten years old and when it is forty years old. That matters because solar is a roof decision before it is an electricity decision.
Our customers in Clovis tell us the same story over and over: they bought from an out-of-state installer who quoted one number on the phone and a different number at the door. Then the system went live and nobody called them back. Gus does not operate that way. He quotes off your actual utility bill, gives you the year-25 output number instead of a day-one brochure figure, and tells you to take two weeks before you sign anything. If a salesman needs an answer tonight, the answer is no.
The 90-Day Done Right Promise is in writing on every Clovis solar job. If it is not right, Gus makes it right. That is not a marketing line. That is the standard we have operated under since day one, and it is why much of our Clovis work comes from referrals in neighborhoods like Dry Creek Preserve and along the Clovis Avenue corridor.
Our Solar Panel Installation Services in Clovis
Rooftop Solar Installation
Most Clovis homes are built with composite shingle or concrete tile, and the roof pitch varies block to block. We design each array around your actual roof geometry, your afternoon air-conditioning load, and the NEM 3.0 export math-not a generic template. A standard rooftop install in Clovis takes two to three days on the roof, plus a utility approval window that usually runs one to three weeks with PG&E.

Solar System Design & Permitting
Clovis pulls building permits through the city’s planning division, and every solar job requires stamped plans, structural review, and a final inspection. We handle all of it. Our design team sizes systems to your real usage profile from your PG&E bill, accounting for the fact that a 105°F Clovis July afternoon is when you need production the most-and when NEM 3.0 pays you the least for what you send back.

Solar Panel Replacement
A dead panel or failed microinverter does not mean you need a new array. In Clovis, we frequently see individual panel failures show up as one flat line on a monitoring app while the rest of the system hums along. Last Tuesday we pulled a failed Enphase IQ7A microinverter off a tile roof near Temperance and Bullard in the 93619 side of Clovis. The homeowner’s app showed one panel producing zero while the other 22 ran fine-we swapped the microinverter, re-paired it, and confirmed the degradation rate on the remaining panels matched the warranty sheet before we left, same day. That is the level of attention we bring to every replacement.

Roof-Mount & Tile Roof Solar
Clovis has a lot of Spanish tile roofs, especially in the older neighborhoods near Old Town and the custom-home tracts in 93612. Installing on tile without cracking it takes time and the right flashing technique. Gus’s crew does this work with tile hooks and proper weatherproofing at every penetration. The alternative-drilling through tile and hoping the seal holds-is how you get leaks that show up as ceiling stains two years later. We do not cut that corner.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Clovis
We work with the equipment homeowners actually want: Tesla and Enphase for inverters and batteries, SolarEdge for string systems, FranklinWH for whole-home backup, and panels from Qcells, REC, Panasonic, and others. We keep common replacement parts and inverters stocked for Clovis customers, which means a failed microinverter or a dead panel does not sit waiting on a warehouse two states away. If we can fix it today, we do.
Common Solar Panel Installation Problems We See in Clovis Homes
- Rapid shutdown false trips during summer heat swings. Clovis summers push rooftop temperatures past 130°F, and we have seen inverter firmware lock up midday when the temperature swing is sharp. It looks like a system failure but is often a firmware or connection issue. We diagnose it before recommending anything expensive.
- Tile roof leaks around flashed mounts after heavy Sierra runoff years. Clovis sits downhill from Sierra snowmelt, and when runoff years hit hard, the ground soaks and the attic humidity climbs. Poorly flashed mounts from other installers start to weep. We find these with a moisture check before the ceiling stains appear.
- NEM 3.0 true-up sticker shock. Homeowners who sized their array to total annual usage-not afternoon usage-get a true-up bill in year one that stings. Under NEM 3.0, exported power is credited at roughly 75% below retail. We right-size arrays to your actual afternoon load so the math works on paper before you spend a dollar.
- Underperforming older panels that never got cleaned or inspected. Clovis dust and pollen season is real, and a layer of dirt on a 10-year-old array can knock production down 5-10%. We clean and inspect, and if a panel has degraded beyond its warranty spec, we document it properly for a claim.
Pricing for Solar Panel Installation in Clovis, CA
Here is what we charge in Clovis, straight up:
- Full rooftop solar installation (6-10 kW): $16,500-$34,000 before the federal tax credit, depending on panel count, roof type, and electrical work.
- Solar panel replacement (single panel, including labor and diagnostics): $350-$650 for a standard 400W panel; tile roof replacements trend toward the higher end.
- Microinverter replacement (Enphase IQ series): $280-$450 per unit, including roof access and re-pairing.
- Solar system design & permitting package: $1,200-$2,800 depending on system size and whether structural upgrades are required.
- Tile roof mount and flashing add-on: $1,500-$3,500 over a standard mount, depending on tile count and complexity.
Bring us a bill, and we will bring you the math. Every estimate in Clovis is built off your actual PG&E usage and current NEM 3.0 export rates, not a brochure figure. Estimates are free. Call (877) 550-6892 and ask us to come out-we will be straightforward about whether solar is worth it for your roof and your rate plan.
We Also Serve Cities Near Clovis
Our crews serve Solar Panel Installation customers throughout the Central Valley. In addition to our work across Clovis, we install and service systems in Fresno, Old Fig Garden, Sanger, and Fowler. If you are just outside the Clovis city limits, call us-we will let you know straight away whether we cover your street. Dispatch and scheduling are coordinated from our Fresno, Central Valley office, and our crews work in Clovis daily.
Serving Clovis, CA - Our Local Coverage Area
We’re based in the Clovis area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Solar Panel Installation in Clovis
Yes. We use tile hooks and proper flashing on Spanish tile roofs in 93612 and throughout Clovis, and we do not drill through tiles to save time. The install takes longer on tile than on shingle-usually by a day or two-but doing it right is the difference between a roof that stays dry for 30 years and one that leaks after the first heavy rain. Call (877) 550-6892 for a site visit and we will tell you exactly how we would approach your roof.
Clovis homes are on PG&E’s NEM 3.0 tariff, which credits exported solar power at roughly 75% below the retail rate. That means a system sized to your total annual usage will not pay back as fast as it would have under the old NEM 2.0 rules. The way to make solar pay in Clovis now is to size the array to your afternoon load-especially summer AC usage-and add battery storage if you want to shift power into the evening. We will walk you through the math on your own bill, no pressure and no same-day signature.
In most cases, same day or next day. We keep common panels and Enphase microinverters stocked for Clovis customers, and our crews are in 93619 regularly. If your monitoring app shows a panel at zero while the rest of the array runs normally, call us at (877) 550-6892 and we will come out, diagnose it, and replace it if needed-often in one trip.
Sometimes. If your tile roof in Clovis is 20+ years old and has not had a proper inspection, we will check the underlayment, flashings, and tile condition before recommending solar. Putting panels on a roof that needs work means removing and reinstalling the array later, which costs more than doing it right the first time. We will tell you honestly if a re-roof makes sense first, and we can coordinate the sequence so you are not paying for unnecessary work.
Yes, if the system is sized to your actual afternoon load. A properly sized Clovis array will cover the bulk of your summer AC usage during peak production hours. Under NEM 3.0, the export credits do not help much, so the key is pairing panels with battery storage or shifting your heavy loads to midday. We will show you the projected year-25 output and the real payback math before you sign anything. Call (877) 550-6892 for a free estimate-the number we quote is the number you pay.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Clovis with honest solar work and straight answers since 2011.






Before
After
Before
After
Before
After