Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Woodland Hills
EV charger installation in Woodland Hills usually costs between $750 and $2,800 for a Level 2 charger on an existing panel, and a typical job is completed in one day by a licensed electrician who pulls the permit, runs the circuit, and mounts the unit. If your panel needs an upgrade for the extra load, you’re looking at $2,500 to $5,500 more, depending on whether you go from 100 amps to 200 amps on a 1950s ranch or a hillside custom. We serve every Woodland Hills zip code from 91364 to 91371, and we know the difference between wiring a garage on Burbank Boulevard and pulling conduit through a steep lot off Mulholland Drive. Call (877) 550-6892 and we’ll give you a straight number, not a brochure range.
Why Gus’s Solar Is Woodland Hills’s Preferred EV Charger Installation Company
Gus Petrakis has been an EV Charger Installation electrician since 2011, and he still answers his own phone. That matters in Woodland Hills, where homeowners have already dealt with enough out-of-state outfits that quote one price on the lot and another at the door. Gus’s crew are background-checked and uniformed, and the person who shows up for your EV charger install is the same person who will come back if anything acts up. No subs, no third-party dispatch. The office is coordinated from the Los Angeles metro area, and our local crew services Woodland Hills directly.
We hold to a 90-Day Done Right Promise on every job, in writing. If the charger placement, the conduit run, or the panel work isn’t right, Gus makes it right, and one call brings him back. We also answer the phone 24/7 with a live person, not a voicemail tree. When a main breaker trips at 11 p.m. on a 112°F Woodland Hills night, you call and a human picks up.
Take your time. Bring us a bill, we’ll bring you the math. The price we quote is the price you pay, and nobody is going to pressure you to sign tonight. If a salesman needs an answer tonight, the answer is no.
Our EV Charger Installation Services in Woodland Hills
We handle the full range of EV charging work across Woodland Hills, from simple wall-mounted units on existing circuits to full panel upgrades paired with solar. These are the four jobs we do most often in the 91364 through 91371 zips.
Level 2 Charger Installation
A Level 2 charger on a 240-volt circuit charges your EV roughly five to seven times faster than the 120-volt cord that came with the car. Most Woodland Hills ranch homes from the 1950s and 60s have a 100-amp panel, so before we mount anything we run a load calculation against your AC compressor, dryer, and oven. If the numbers work, we install the charger, pull the permit, and have you charging the same day. If the numbers don’t, we tell you that before we cut any holes.

Tesla Wall Connector Installation
The Tesla Wall Connector is the most common unit we install in Woodland Hills, and for good reason. It delivers up to 44 miles of range per hour on a 60-amp breaker, and it integrates cleanly with the Tesla app. We stock the unit locally for Woodland Hills customers and can typically install it within a few days of your call. On hillside custom homes, we pay close attention to the garage’s proximity to the main panel and whether a subpanel makes more sense than a long conduit run.

Panel Upgrade for EV Charging
If your 1950s ranch home in Woodland Hills still has a 100-amp panel, adding a Level 2 charger that draws 48 amps continuous will usually push you past the safe limit on summer nights when the AC is running flat out. We’ll upgrade you to a 200-amp panel, which gives you headroom for the car, the air conditioner, and future solar. On homes off Ventura Boulevard and in the Warner Center area, we see this need on roughly half of all EV charger installs.

Garage & Driveway Charger Wiring
Woodland Hills garages come in two flavors: attached and level with the house, or detached and down a slope. For attached garages on the valley floor, the conduit run is typically short and straightforward. For detached garages in the hillside neighborhoods off Topanga Canyon Boulevard, we often run underground conduit and size the wire for voltage drop over the longer distance. Either way, the job is done with EMT conduit, proper grounding, and a permit that protects you when you sell the house.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Woodland Hills
We install and service every major EV charger brand on the market: Tesla, ChargePoint, Enphase, Wallbox, Emporia, and JuiceBox. For solar-paired setups, we work with Panasonic, Qcells, Canadian Solar, and FranklinWH batteries, among others. We keep common parts and breakers stocked for Woodland Hills jobs, which means fewer return trips and a faster turnaround when your charger needs a firmware update or a replacement breaker. You don’t have to wait on a parts shipment from a warehouse in another state.
Common EV Charger Installation Problems We See in Woodland Hills Homes
- 100-amp panels on 1950s ranch homes. The valley floor of Woodland Hills is dominated by tract housing from the Eisenhower and Kennedy years, and most of those panels were designed for a world without EVs or central air. When we add a 48-amp charger draw to a panel already feeding a 4-ton AC unit, the main breaker can trip on the first 110°F afternoon. We catch this with a load calculation before we ever touch the panel.
- VHFHSZ setback rules on hillside garages. Much of northern Woodland Hills sits inside Los Angeles’s Very High Fire Hazard Severity Zone. If your solar panels or charger equipment encroach on the 36-inch ridge and hip setbacks LAFD requires for firefighter access, you’ll fail inspection and have to move things. We know these rules cold because we apply them on hillside jobs off Mulholland and Topanga every month.
- Derated production estimates for extreme heat. Woodland Hills hit 121°F on September 6, 2020, the highest temperature ever recorded in Los Angeles County. Panels lose roughly 0.3 to 0.5 percent efficiency per degree above 25°C, so in a Woodland Hills July, that’s a real loss. A solar-paired EV system sized with a coastal LA production estimate will undershoot your actual usage, and your true-up bill will show it. We derate for heat specifically in this market.
- Santa Ana dust on solar panels feeding your charger. The Santa Anas blow fine dust and chaparral debris across the western San Fernando Valley, and it settles on panels. In Woodland Hills, soiling losses are higher than in coastal LA, and that directly cuts the kWh your solar array sends to your EV charger. We recommend a cleaning schedule that matches the wind season, not a generic once-a-year plan.
Pricing for EV Charger Installation in Woodland Hills, CA
Here’s what you can expect to pay in Woodland Hills right now. A standard Level 2 charger install on an existing 200-amp panel with a short conduit run runs $750 to $1,400, including the unit. A Tesla Wall Connector install on a 60-amp circuit typically runs $900 to $1,600. If you need a panel upgrade from 100 to 200 amps, add $2,500 to $5,500 depending on whether your panel is in the garage or on an exterior wall with a longer service entrance. Solar-paired EV charging, where we tie your charger to a solar array with Enphase microinverters and a FranklinWH battery, starts around $14,000 for a modest system and goes up from there based on your roof’s usable area and your household’s kWh load.
Those are real Woodland Hills numbers, and they include the permit and the inspection. Call (877) 550-6892 for an exact quote on your address. The estimate is free, and there is no trip charge inside our own county.
We Also Serve Cities Near Woodland Hills
Our crew regularly drives out to Canoga Park, Calabasas, West Hills, and Topanga for EV charger installs and panel upgrades. If you’re in a neighboring community and wondering whether we cover your street, call us. We probably do. Serving Woodland Hills means knowing the whole western valley’s electrical quirks, from the tract homes near Pierce College to the custom estates above the 101.
Serving Woodland Hills, CA - Our Local Coverage Area
We’re based in the Woodland Hills area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Woodland Hills
On a 121°F afternoon, your air conditioner is pulling near its maximum amperage while your EV charger is also drawing 48 amps continuous, and if you’re on a 100-amp panel, the math doesn’t work. The main breaker trips, and you lose power to the charger, the AC, or both. That’s why we run a load calculation against your specific equipment before any install and recommend a panel upgrade when the combined load exceeds 80 percent of your panel’s rating. Call (877) 550-6892 and we’ll walk through your actual panel label with you.
Yes, the Tesla Wall Connector itself is not a roof-mounted solar device, so it doesn’t trigger the LAFD 36-inch ridge, hip, and valley setback rules that apply to solar panels in the VHFHSZ. What does matter is any solar array you pair with the charger. If you’re putting solar on a Woodland Hills hillside roof to feed the EV, those panels must comply with firefighter access setbacks, and we size the system accordingly. The charger and the panel work go hand in hand.
Most 1950s ranch homes in the 91364 and 91367 zips have a 100-amp panel, and a Level 2 charger drawing 48 amps needs a 200-amp panel to leave room for your AC, dryer, stove, and lights. Upgrading from 100 to 200 amps runs $2,500 to $5,500 in Woodland Hills depending on the service entrance location and whether the utility needs a new meter socket. On a 2020 census of the valley floor tracts, roughly half the homes we visit need this upgrade before the charger goes in.
Woodland Hills gets hotter than Santa Monica by a wide margin, which means your AC load is higher and your solar production per panel watt is actually lower due to the heat derating. Net metering credits your solar export at the retail rate, so the value of every kWh you send back is the same, but a Woodland Hills home uses more kWh overall, especially for cooling. That means a solar-paired EV system in Woodland Hills has a slightly longer payback period than a coastal install with the same panel count, but the total dollar savings are larger because your bill is larger. We quote the year-25 output, not the day-one brochure number.
Yes. Santa Ana winds deposit fine dust and chaparral debris on panels across the western San Fernando Valley, and Woodland Hills sits directly in that path. Soiling losses of 5 to 10 percent are common here between cleanings, versus 2 to 3 percent in coastal LA. If your solar panels are undersized by even 8 percent due to dust, your EV charger pulls more from the grid and your true-up bill climbs. We recommend cleaning every 4 to 6 months in Woodland Hills, timed around the October and March wind seasons. Call (877) 550-6892 for a free second opinion on your system’s production.
If you’re ready for straight numbers on EV charger installation in Woodland Hills, call Gus at (877) 550-6892. You’ll get a live person, a free estimate, and no pressure to sign anything tonight. Senior and veteran discounts never expire.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Woodland Hills since 2011.






Before
After
Before
After
Before
After