Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Taylor
EV charger installation in Taylor, TX typically costs $450-$1,400 for a standard Level 2 setup, and most jobs are finished in one visit. If your home was built before 1950, plan for a panel upgrade that adds $1,800-$3,500. Gus’s Solar does this work every week across Taylor’s in-town neighborhoods and the new Samsung-corridor subdivisions. We know TED’s paperwork, we know the older panels on Davis and Main, and we answer the phone when you call (877) 550-6892.
Why Gus’s Solar Is Taylor’s Preferred EV Charger Installation Company
Gus Petrakis started this company in 2011 and never handed the work to a sub. The crew showing up at your house in Taylor is Gus’s own crew: background-checked, uniformed, and trained on the specific municipal utility rules that trip up out-of-town installers. When a Taylor customer calls about a charger that won’t power up, we don’t route them to a ticket queue. A live person answers, 24/7.
We’ve worked in the pre-WWII bungalows near Murphy Park where 60-amp fuse boxes still live in closets, and in the new-construction subdivisions east of town where the panels are modern but the garage wiring wasn’t specced for a 48-amp charger. That range matters. It means we show up knowing what we’re likely to find before we open the panel. Taylor homeowners tell us the same thing after every job: the price on the quote was the price on the invoice. That’s not a marketing line. It’s how Gus runs the books.
If you want to verify any of this, Gus publishes his name, address, and license number. He’s the owner, and he’s the one who takes accountability when something needs to be made right. The 90-Day Done Right Promise is in writing on every job: if it’s not done right, one call brings Gus back. No fine print, no arguing.
Our EV Charger Installation Services in Taylor
We handle the full range of EV Charger Installation work in Taylor, from a simple garage outlet to a solar-paired system that draws from your own roof. Here’s what we do most often for Taylor homeowners:
Level 2 Charger Installation
A Level 2 charger on a 240-volt circuit adds 25-35 miles of range per hour, which covers most Taylor commutes overnight. We pull the permit through Taylor Electric Department, run the dedicated circuit, mount the unit, and walk you through the app before we leave. In older Taylor homes, this job sometimes includes a service upgrade, which we’ll flag during the estimate so there are no surprises on install day.

Tesla Wall Connector Installation
The Tesla Wall Connector draws up to 48 amps, which is more than most pre-1990 Taylor panels can safely provide. We install these regularly in the new subdivisions around Samsung Boulevard where 200-amp service is standard, and in older homes where we upgrade the panel first. We also program the connector’s scheduling features to align with TED’s time-of-use rates, so you charge when power is cheapest. For Taylor Tesla owners, pairing the Wall Connector with a solar system often drops the effective fueling cost to near zero during daytime charging.

Panel Upgrade for EV Charging
Roughly half the EV charger jobs we quote in central Taylor need a panel upgrade first. If your home still has a 60-amp or 100-amp service, adding a 48-amp charger will overdraw the panel and trip the main breaker. We upgrade to 200 amps, which also gives you headroom for future solar, a heat pump, or a second EV. This is the single most important local consideration for Taylor EV owners in the pre-WWII housing stock, and we quote it accurately the first time.

Garage & Driveway Charger Wiring
Some Taylor garages are detached. Some are on alleys. Some homes charge in the driveway because the garage is full. We run conduit and cable for whichever setup you have, including exterior-rated runs to a pedestal or wall mount. Underground runs in Taylor’s Blackland Prairie clay need proper trenching and conduit depth, and we do that work in-house rather than handing it to a subcontractor we just met.

Solar-Paired EV Charging
This is where Gus’s Solar goes deeper than a generic electrician. A solar array sized to feed an EV means your fuel comes from your own panels instead of TED’s grid. But here’s what matters locally: Taylor Electric Department sets its own export compensation rules, and they are not the same as what applies across the county line. We size the solar and the charger together using your actual TED bill and TED’s current buyback structure, so the year-25 output estimate is real, not a brochure number. If you bring us a bill, we’ll bring you the math.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Taylor
We install and service chargers from Tesla, ChargePoint, Enphase, and Emporia, and we stock the most common local parts so Taylor customers aren’t waiting on a shipment from Dallas. Our solar work pairs with Qcells, REC, and Panasonic panels, which we’ve installed for years and can service without pointing you to a manufacturer’s helpline. If you already have a charger from another installer and it’s acting up, we’ll diagnose it. If you’re starting fresh, we’ll recommend what fits your panel, your garage layout, and your driving habits, not whatever unit we have the most inventory of that week.
Common EV Charger Installation Problems We See in Taylor Homes
After years of work in Taylor, we can usually predict what a home needs before we open the panel. Here are the recurring issues:
- 60-amp fuse panels in pre-WWII bungalows. Many downtown Taylor homes built before 1950 still run on original 60-amp service with a fuse box in a hallway closet. A Level 2 charger on this panel will trip the main constantly, and no amount of “just use a lower setting” makes it safe. These homes need a panel upgrade first.
- Out-of-town installers filing Oncor paperwork with TED. Taylor Electric Department is a municipal utility with its own interconnection forms, inspection scheduling, and metering configuration. Companies that auto-populate Oncor forms delay permits by weeks. We do TED’s process directly, and we know who to call at the utility when a permit needs a nudge.
- Garages wired with a single 15-amp branch circuit. Older Taylor homes built mid-century often have the garage sharing one 15-amp circuit with the kitchen or laundry. A charger on that circuit will trip the breaker immediately. We run dedicated 240-volt home runs for every Level 2 install, no exceptions.
- Solar-paired chargers sized on neighboring utilities’ net metering rules. A solar array and EV charger sized for Round Rock’s Oncor net-metering credits will underdeliver on true-up value in Taylor because TED’s export compensation structure is different. We model your system on TED’s actual rules, not a generic Texas assumption.
Pricing for EV Charger Installation in Taylor, TX
Here are straight numbers for the Taylor market. A standard Level 2 charger installation with an existing 200-amp panel and a short wire run runs $450-$850. A Tesla Wall Connector install on a panel upgrade job totals $2,300-$4,300 including the panel replacement to 200 amps. A panel upgrade alone in Taylor runs $1,800-$3,500 depending on whether we’re replacing a 60-amp fuse box or a 100-amp breaker panel and how far the service drop travels. Garage and driveway wiring with exterior conduit adds $200-$600 depending on run length and trenching. Solar-paired EV charging is priced off your actual TED bill and driving miles, not a per-watt brochure figure. Every estimate is free, and the price we quote is the price you pay. Call (877) 550-6892 for an exact number on your home.
We Also Serve Cities Near Taylor
Our EV Charger Installation in Taylor team also covers Hutto, Round Rock, Pflugerville, and Elgin. If you’re just outside city limits on a county road, call anyway. We’re familiar with the permitting differences between TED territory and the Oncor-served areas nearby, and we’ll tell you up front which process applies to your address.
Serving Taylor, TX - Our Local Coverage Area
We’re based in the Taylor area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Taylor
Yes, almost certainly. Pre-1950 Taylor homes typically have 60-amp fuse panels or 100-amp breaker panels that cannot safely support a 48-amp Level 2 charger. The upgrade to 200-amp service runs $1,800-$3,500 in Taylor, and it’s required before we’ll install the charger. Call (877) 550-6892 and we’ll assess your panel on the first visit.
TED buys back solar export at rates it sets through its own municipal utility policy, not through the PUCT rules that govern Oncor-served cities like Georgetown or Round Rock. That means the financial value of daytime solar generation for EV charging depends on TED’s current export schedule. We model your charger and solar together on TED’s actual numbers so your year-25 output estimate is honest, not hypothetical. Bring us a TED bill and we’ll show you the real math.
Yes, in most cases. Homes built in Taylor’s new subdivisions since 2022 generally have 200-amp service, which supports a 48-amp Tesla Wall Connector with room to spare. The catch is that some builders wired the garage with a single 15-amp or 20-amp branch circuit, so we still need to run a dedicated 240-volt line. The job is straightforward, typically $450-$850, and usually done same day.
That depends on how the estimate was built. Taylor gets over 220 sunny days a year, and peak solar generation lines up closely with TED’s highest-cost grid hours. But if your solar estimate was calculated from a generic Texas profile and didn’t factor in your actual miles driven, your EV’s charging load, and TED’s export compensation structure, it will underdeliver. We build your estimate from your real TED bill and your actual driving, so the number holds up in year 25. Call (877) 550-6892 for a free estimate that accounts for all of it.
TED enforces its own rapid shutdown and inspection sequence for solar-paired EV charger installations, and it’s not the same as the Oncor process used in surrounding cities. Out-of-town installers who assume Oncor rules apply will have their permits stalled at the inspection phase, sometimes for weeks. We file TED’s exact forms, schedule TED’s inspections on TED’s calendar, and configure the metering to TED’s specification the first time. That’s the difference between a one-visit install and a one-month headache.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Taylor and Williamson County since 2011.
Call (877) 550-6892 for a free EV charger installation estimate in Taylor. A live person answers, day or night. Bring us a bill, we’ll bring you the math. Take two weeks to think about it. The price will be the same.






Before
After
Before
After
Before
After