Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Sausalito
EV charger installation in Sausalito typically costs $1,400-$3,800 for a standard Level 2 setup, and most jobs are completed in a single day. We serve the 94965 and 94966 zip codes, including the hillside neighborhoods off Bridgeway and the floating-home docks along Richardson Bay. If you’re tired of waiting at public chargers or tripping breakers on a 60-year-old panel, call Gus’s Solar at (877) 550-6892 and we’ll give you a straight answer about what your house actually needs.
Sausalito throws two curveballs at EV charger installs that you won’t find in Mill Valley or Corte Madera. First, much of the housing stock dates to the 1920s through 1960s, which means original 100-amp panels and cloth-wrapped wiring that were never designed for a 48-amp continuous load. Second, the floating-home communities along Richardson Bay run on shore-power pedestals with metered rates far above what PG&E charges a land-based home. We know both problems well, because we’ve been fixing them since 2011. Not as some fly-by-night crew, but as the company Gus Petrakis put his own name on.
Why Gus’s Solar Is Sausalito’s Preferred EV Charger Installation Company
We’re not a call center that dispatches a random contractor. Gus’s Solar is owned by Gus Petrakis, and his crew does the work. The same background-checked, uniformed people who show up at your door are the ones pulling the permit, torquing the lugs, and testing the circuit before they leave. A live person answers our phone 24/7, not a voicemail tree. When Sausalito homeowners call at 7 a.m. because their charger tripped overnight, they talk to a real human who knows their address.
Local reputation matters here more than almost anywhere in Marin. Sausalito is small. Word travels fast along Caledonia Street and up the hillside stairways. We’ve built our name by showing up on time, doing the work right, and coming back if something isn’t perfect. That’s the 90-Day Done Right Promise, in writing on every job, and it’s exactly what it sounds like. If it’s not right, Gus makes it right.
Our crews know that Bridgeway traffic gets jammed on weekends and that the floating-home docks off Gate 5 Road have different electrical infrastructure than the hillside homes above them. That’s not trivia. It’s the difference between a charger install that works for 20 years and one that corrodes within 18 months in the salt spray.
Our EV Charger Installation Services in Sausalito
Level 2 Charger Installation
A Level 2 charger adds roughly 25-30 miles of range per hour, which covers everything from a daily commute across the Golden Gate Bridge to a weekend run up to Point Reyes. Most Sausalito homes we see need a dedicated 240V circuit run from the main panel to the garage or driveway. On older hillside homes, that means fishing cable through crawl spaces and walls that predate modern building codes. The typical Level 2 install in Sausalito runs $1,400-$2,800, depending on panel capacity and circuit length.

Tesla Wall Connector Installation
The Tesla Wall Connector is the most common request we field, and for good reason. It’s hardwired, weather-rated for outdoor mounting, and can push up to 48 amps continuous. We recently installed one on a 1962 split-level off Bridgeway with an original 100-amp panel. Our techs rerouted a 60-amp circuit through stainless conduit, added a subpanel, and fished the feeder through an old crawl space with no attic access. Every lug got torqued with a calibrated wrench, and we confirmed 48A continuous after a thermal scan of the service entrance. Tesla Wall Connector installs in Sausalito typically run $1,800-$3,200 including the unit and all wiring.

Panel Upgrade for EV Charging
This is the big one in Sausalito, and the thing that surprises new EV owners most. Homes built between the 1920s and 1960s often have 100-amp panels that were sized for incandescent bulbs and a single kitchen appliance. Adding a 48-amp charger to that panel will nuisance-trip your main breaker, especially during morning charge cycles when the water heater and furnace are also running. A panel upgrade to 200 amps in Sausalito runs $3,500-$6,500, and it’s often the difference between a charger that works and one that leaves you stranded.

Garage & Driveway Charger Wiring
Many Sausalito garages are east-facing, built into the hillside, with no attic above and no easy path from the panel. We handle the hard ones. Conduit runs along exterior walls, feeders through old crawl spaces, subpanels where the main panel is maxed out. If your driveway charger needs to reach a car parked on the street side of a retaining wall, we’ll design the run to survive the constant moisture that rolls through the Golden Gate. Garage and driveway charger wiring in Sausalito typically runs $800-$2,200, depending on distance and access difficulty.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Sausalito
We install and service chargers from Tesla, ChargePoint, Enphase, Emporia, and Wallbox, and we stock common parts in our Bay Area shop so Sausalito customers aren’t waiting two weeks for a breaker or a connector. For homes pairing solar with EV charging, we work with Panasonic, Canadian Solar, and FranklinWH equipment. Bring us your PG&E bill and we’ll show you exactly what your charger would draw and what a solar array sized to offset it would produce in Sausalito’s fog. Our EV Charger Installation team does the charger, the panel, and the solar as one cohesive job, not three separate contracts. When you call, you get the math, not a brochure.
Common EV Charger Installation Problems We See in Sausalito Homes
- Nuissance tripping on 100-amp panels. Hillside homes from the 1950s and 1960s weren’t built for a 48-amp continuous draw. The main breaker trips during your morning charge, and suddenly the refrigerator is off too. The fix is usually a panel upgrade or a load-mitigation strategy we can walk you through on the phone.
- Corroded terminals from salt air. Sausalito’s marine layer isn’t just fog. It carries salt, and that salt gets into every connection. Aluminum SER cable without anti-oxidant compound near the bay corrodes within a year, causing intermittent charging and arc faults. We use marine-rated hardware and proper torque on every connection, because cutting corners here means a service call six months later.
- Loose NEMA 14-50 receptacles on floating docks. Floating homes rock. Constantly, subtly. A plug-in charger on a dock settles, shifts, and develops heat at the receptacle. A hardwired wall connector eliminates that failure point entirely. We’ve seen the scorch marks. It’s not a hypothetical.
- Undersized feeders from shore-power pedestals. Many floating-home residents on the Richardson Bay docks pay $0.25-$0.35/kWh or more for shore power. Adding a Level 2 charger to that system requires a dedicated marine-rated feeder and often a subpanel upgrade, or the shore-power breaker pops every time you plug in the car.
Pricing for EV Charger Installation in Sausalito, CA
Here’s what you’ll actually pay in Sausalito, based on the jobs we’ve done here. Straightforward Level 2 charger install with an open breaker slot and a short conduit run: $1,400-$2,200. Tesla Wall Connector with a longer feeder or a subpanel: $1,800-$3,200. Full panel upgrade to 200 amps: $3,500-$6,500. Floating-home install with marine-rated conduit and a dedicated feeder: $2,800-$5,000, depending on what the shore-power pedestal requires. Every quote we give is anchored to your actual electrical panel, your actual charger, and your actual home. No brochure numbers, no bait pricing. Bring us your bill, I’ll bring you the math. Call (877) 550-6892 for a free estimate, and take two weeks to think about it. The price will be the same. If a salesman needs an answer tonight, the answer is no.
We Also Serve Cities Near Sausalito
Our crews work throughout Sausalito and the surrounding Marin County communities. That includes Tiburon, Tamalpais Valley, Tamalpais-Homestead Valley, and Mill Valley. Same crews, same 90-Day Done Right Promise, same live person answering the phone 24/7.
Serving Sausalito, CA - Our Local Coverage Area
We’re based in the Sausalito area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Sausalito
Yes, you can absolutely install a Level 2 charger on a floating home, but the wiring is different from a land-based job. We use marine-rated stainless conduit, waterproofed electrical penetrations, and corrosion-resistant hardware throughout, because the salt spray and constant low-amplitude rocking will destroy standard residential materials within a year or two. You’ll also need a dedicated feeder from your shore-power pedestal, and in many cases a subpanel upgrade, since most floating homes in Sausalito are running near their existing shore-power capacity. The shore-power rates along Richardson Bay run $0.25-$0.35/kWh or more, so pairing that charger with a solar system on your roof deck often pays for itself faster than you’d expect. Call (877) 550-6892 and we’ll take a look at your pedestal and panel before you spend a dime.
Most installs take one day, but hillside homes with original 1960s panels and no attic access can run two days, especially if we’re fishing feeders through old crawl spaces or upgrading the panel. The charger itself mounts in under an hour. The time is in the wiring run, the panel work, and the thermal testing we do before we leave. We torque every lug with a calibrated wrench and scan the service entrance under load. That’s what takes the time, and it’s why our chargers don’t fail six months later.
Yes, Sausalito requires a permit for a hardwired Level 2 charger, and we pull it ourselves. We handle the paperwork, the inspection scheduling, and any corrections the inspector requests. We don’t ask you to pretend it’s a DIY job or skip the permit to save a few hundred dollars. The permit is cheap compared to the liability of an unpermitted 48-amp circuit feeding a car in your garage.
Here’s the honest answer: Sausalito’s persistent summer morning fog, funneling through the Golden Gate, suppresses solar production by a measurable margin compared to cities just 8-10 miles inland like San Rafael or Novato. That doesn’t mean solar won’t work. It means the array has to be sized correctly, with accurate site-specific shading analysis, not a generic calculator. We quote the year-25 output, not the day-one brochure number. For an EV owner driving 12,000 miles a year, you’re looking at roughly 3,500-4,500 kWh of annual charging demand. In Sausalito’s fog, that often means an extra 4-6 panels compared to an inland Marin home. We’ll show you the math off your actual bill before you decide anything.
A hardwired charger is more reliable than a plug-in NEMA 14-50 outlet, full stop, especially near the bay. The corrosion risk from salt air and the constant temperature swings make a hardwired connection with properly torqued, marine-rated terminations the only thing we recommend on homes within a few blocks of the water. The Tesla Wall Connector, ChargePoint Home Flex, and Enphase chargers are all solid choices. We’ll match the charger to your panel, your car, and your home’s electrical reality. Call (877) 550-6892 for a straight recommendation and a free estimate.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Sausalito since 2011.






Before
After
Before
After
Before
After