Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Modesto
EV charger installation in Modesto typically costs between $650 and $2,800 for a Level 2 station, with most standard garage installs landing around $1,100 to $1,600. If your panel needs an upgrade first, add another $2,500 to $4,500. We get a live person on the phone when you call (877) 550-6892, and our crew knows which side of the utility boundary your street sits on before we even pull up. That matters more here than almost anywhere else in California.
Modesto is a city we know block by block. We have worked in the La Loma district off Yosemite Boulevard, in the Village One neighborhoods off Floyd Avenue, and through the 1960s ranch tracts that fill the 95351 and 95354 zip codes. Our EV Charger Installation team lives with the same tule fog and the same 100-degree Julys you do. That local knowledge shapes how we size your circuit, where we run your conduit, and what we tell you about pairing a charger with solar on your side of the meter.
Why Gus’s Solar Is Modesto’s Preferred EV Charger Installation Company
Gus Petrakis put his name on this company in 2011, and he publishes his address and license number for anyone to check. When you call about an EV charger in Modesto, you talk to a person who knows what a McHenry Avenue traffic backup feels like and can tell you when our crew will actually arrive. We do not run a call center in another state, and we do not sell your name to a subcontractor. Gus’s own crew does the work.
Our Modesto customers keep our calendar full because we tell the truth about what a job costs and how long it takes. A homeowner in the 95352 zip near Modesto Junior College told us she had been quoted $1,900 over the phone by a national outfit, only to have the tech arrive and say the dryer outlet would have to go. We quoted $1,275 and did it the same day. We do not need a signature from you tonight. Bring us your utility bill and we will show you the math on what a solar-paired charger actually returns under MID or PG&E rates. Take two weeks. The price will be the same when you call back. L.O.C.A.L. is not a tagline for us. It is how we operate: Local roots, On time, Community first, Accountable, Loyal.
Our EV Charger Installation Services in Modesto
Level 2 Charger Installation
A Level 2 charger adds roughly 25 to 30 miles of range per hour, which makes it the practical choice for nearly every Modesto homeowner. We hardwire or install NEMA 14-50 outlets in attached garages, detached garages, and exterior walls where a driveway has no garage. In older Modesto neighborhoods like the 95351 area west of Highway 99, we regularly find panels from the 1960s and 1970s that need attention before any charger can pass inspection. We check that first.

Tesla Wall Connector Installation
The Tesla Wall Connector is the charger we install most often in Modesto, and we stock the units locally so we are not waiting on a shipping window. We have mounted them in the newer subdivisions off Dale Road in 95356, in the tree-lined streets of College Area, and in homes out toward the airport. If your Tesla sits outside a garage that is full of furniture, we can run weather-rated conduit to a pedestal mount and keep the whole install compliant with both the National Electrical Code and your HOA’s architectural rules. Call (877) 550-6892 for a free estimate on a Wall Connector install.

Panel Upgrade for EV Charging
This is the quiet reality of EV ownership in Modesto. A large share of homes built between 1960 and 1985 still run on 100-amp panels, and a Level 2 charger pulling 40 to 48 amps on top of an air conditioner, older electric range, and dryer can overload the service. MID and PG&E both require a load calculation before interconnection, and if the math does not work, the charger does not get approved. We upgrade to 200 amps, which gives you room for today’s charger and tomorrow’s heat-pump water heater. In Modesto, a panel upgrade for EV charging typically runs $2,800 to $4,200 depending on the distance from the meter base and whether the service entrance cable needs replacement.

Garage & Driveway Charger Wiring
We run conduit inside garage walls when we can and surface-mount when we must. Exterior runs on stucco ranch homes need conduit that matches the approved color, not bright gray PVC that sticks out and invites an HOA letter. For homes near La Loma Park or along Miller Avenue, we match conduit and box colors to the stucco, hide runs behind downspouts or along trim lines, and photograph everything for your architectural review file. A clean install keeps the HOA quiet and keeps your property looking the way it should.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Modesto
We install and service chargers across the major brands Modesto homeowners actually buy, including Tesla Wall Connector, ChargePoint Home Flex, Enel X JuiceBox, and Emporia. When your charger pairs with a solar array, the panel brand matters too, and we work with Qcells, REC, and Panasonic modules that hold up well under central valley heat. Because we keep common parts on our trucks, most Modesto service calls get completed the same day without waiting on a distributor. We do not push a brand because it pays us a bigger kickback. We match the charger to your panel capacity, your driving schedule, and your utility rate plan.
Common EV Charger Installation Problems We See in Modesto Homes
- Wrong utility, wrong payback math. A solar-paired charger on a MID-fed house in north Modesto earns avoided-cost credit for excess generation, while an identical system across the street on PG&E earns retail net metering credit. We pull your actual bill and identify your utility before we quote anything.
- Original 100-amp panels from the ranch-home era. The classic Modesto three-bedroom built in 1972 frequently has a 100-amp panel with no spare slots. A Level 2 charger will fail a load calculation, and we will tell you that before you spend money on a charger.
- HOA-conduit conflicts in newer subdivisions. The 2000s-era neighborhoods in 95356 and 95357 often have architectural review boards with strict rules about visible conduit. Gray PVC on a beige stucco garage is a violation waiting to happen.
- Tule fog suppressing solar-paired charger performance. From November through February, dense fog can cut daily solar generation to near zero for stretches. We size battery storage and set charging schedules so your EV still charges overnight without drawing full-price peak power.
Pricing for EV Charger Installation in Modesto, CA
Here are real numbers for the Modesto market. A standard Level 2 charger installation with a short run from an existing panel runs $650 to $1,200. A Tesla Wall Connector install in Modesto typically lands between $900 and $1,600. If we are running conduit more than 50 feet or trenching to a detached garage, expect $1,800 to $2,800. A panel upgrade from 100 to 200 amps adds $2,800 to $4,200. Solar-paired EV charging with a battery costs more upfront, but the monthly fuel savings can be significant once we model your actual consumption against your utility’s rate schedule. Every estimate starts from your real panel, your real run distance, and your real utility. Call (877) 550-6892 and we will send someone out to look. The estimate is free, and no one will stand in your driveway asking for a signature before dark.
We Also Serve Cities Near Modesto
Our crews serve Modesto and the surrounding communities every week, including Bret Harte, West Modesto, Ceres, and Riverbank. If you are in one of those areas and need an EV charger installed or a panel upgraded, call us and we will tell you when we can be there. You get the same local crew, the same upfront pricing, and the same guarantee on the work.
Serving Modesto, CA - Our Local Coverage Area
We’re based in the Modesto area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Modesto
Yes, it changes the financial return of solar-paired charging more than any other single factor. MID credits excess solar generation at an avoided-cost rate that is lower than retail, while PG&E offers retail net metering to most residential customers. If your home is on MID, we often recommend charging your EV directly from solar during midday production rather than banking excess credits, and we size your system accordingly. A house on a PG&E-fed street can send power to the grid during the day and charge at night with full retail credit, while a MID house across the street cannot. We identify your utility first and model the numbers on your actual bill before recommending any equipment. Call (877) 550-6892 and bring us a bill, we will show you the math.
We treat HOA compliance as part of the installation, not an afterthought. We read your HOA’s architectural rules before we quote, then route conduit along interior garage walls, behind downspouts, or along trim lines so nothing visible from the street. When exterior conduit is unavoidable, we paint it to match your stucco color and submit photos for architectural review. We installed a Tesla Wall Connector for a homeowner off Dale Road in 95356 whose HOA required the charger and conduit to match the approved stucco beige and stay hidden from street view. We upgraded their panel, ran the circuit along an interior wall, painted the conduit, and their HOA now uses our install as a compliant example for other neighbors.
Generally no, not without a service upgrade. A Level 2 charger drawing 40 to 48 amps on a 100-amp panel with an existing electric range, air conditioner, and dryer will fail the required load calculation. We do not install chargers on overloaded panels because the utility will not pass the inspection and the breaker will trip constantly. The fix is a 200-amp panel upgrade, which in Modesto runs $2,800 to $4,200, and then the charger install proceeds normally. We will tell you if your panel has capacity before anyone spends a dollar.
Yes, and it catches people off guard. Dense tule fog from roughly November through February can suppress daily solar generation to near zero for multi-week stretches, so a solar array sized on annual average will not cover winter EV charging the way it covers summer. We size battery storage to carry nighttime EV charging through fog weeks, or we set your charger to draw from the grid during off-peak hours when rates are lowest. Anyone who quotes year-round solar coverage in Modesto without accounting for fog is selling you a brochure number, not a real one.
MID and PG&E run entirely separate interconnection queues and inspection timelines, and a house on one side of a Modesto street can have its system live weeks earlier than the house across the street simply because of which utility feeds the pole. MID’s process requires its own application and inspection, which can move faster or slower depending on current volume. PG&E has its own interconnection rules. We manage the paperwork for you and do not quote an install date until the utility timeline is confirmed. If you need a charger working sooner rather than later, call (877) 550-6892 and we will pull your service address to check which utility applies and what the current wait looks like.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Modesto since 2011.






Before
After
Before
After
Before
After