Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Kensington
A Level 2 EV charger installation in Kensington typically runs $1,100 to $2,600, depending on whether your 1920s to 1950s home needs a panel upgrade first. Most jobs take one day for the charger itself; full service upgrades run two to three days. If your Kensington home still has its original 60 to 100 amp fuse or breaker panel, the county will almost always require a 200 amp upgrade before it signs off on a Level 2 circuit. Call us at (877) 550-6892 and we’ll come out, look at your panel and your garage, and give you a straight quote on the spot.
Why Gus’s Solar Is Kensington’s Preferred EV Charger Installation Company
Gus Petrakis runs this business with his own name on the truck and his own crew on every job. We’ve been pulling permits through Contra Costa County long enough to know which inspector covers the Kensington hills, how they read the WUI setback rules, and how to schedule around county inspection backlogs that run two to four weeks in this area. That kind of local knowledge is not something you get from a national installer working out of a call center.
Kensington homeowners call us because they know what they’re getting: background-checked, uniformed technicians who show up on time, a live person who answers the phone 24/7, and pricing that does not change between the quote and the final invoice. No high-pressure pitch. No signature-today demand. Gus tells every customer the same thing: take two weeks, think about it, the price will be the same.
We’ve worked on Craftsman homes off Arlington Avenue, Tudor Revival houses along Coventry Road, and hillside lots where the driveway drops six feet from the street to the garage door. We know what these houses need because we’ve opened their panels, run their conduit, and sat through their county inspections. Our EV Charger Installation team does the work with the same care we bring to every solar job in Kensington.
Our EV Charger Installation Services in Kensington
Level 2 Charger Installation
A Level 2 charger is the standard for Kensington homeowners who drive daily and want a full charge overnight. We install hardwired units on dedicated 240 volt circuits, sized to your panel’s actual capacity and your vehicle’s on board charger. On Kensington’s older homes, we start by checking whether the panel can handle the continuous load. If it can’t, we tell you before we quote anything. A typical Level 2 install in Kensington runs $1,100 to $1,800 when the panel is already sufficient.

Tesla Wall Connector Installation
We install Tesla Wall Connectors throughout Kensington, including the newer Universal Wall Connector that handles both Tesla and J1772 vehicles. These units pull up to 48 amps, which means the circuit, the wire gauge, and the breaker all have to be sized correctly. On a recent 1940s Tudor off Coventry Road, we installed one after replacing the original 60 amp fuse panel with a 200 amp service. The garage door tracks were rusted from salt air, so we ran rigid metal conduit with corrosion resistant fittings and added a surge protector. County inspection took three weeks, about double El Cerrito’s timeline, but we passed first try.

Panel Upgrade for EV Charging
This is the service we do most often in Kensington. Homes built between 1920 and 1955 usually have 60 or 100 amp panels that were never designed for a 48 amp continuous EV load plus air conditioning plus a modern kitchen. When you add a Level 2 charger to that, the panel trips, overheats, or fails the county’s load calculation outright. We replace the old panel with a 200 amp service, handle the utility disconnect and reconnect, and take the permit through Contra Costa County ourselves. A panel upgrade plus Level 2 charger install in Kensington runs $3,800 to $6,500, depending on conduit runs and whether the meter is directly outside the garage or across the lot.

Garage & Driveway Charger Wiring
Kensington’s hillside lots and narrow garages create some genuinely awkward conduit runs. We’ve routed surface mounted EMT along garage interiors, trenched through the strip between driveway and house, and installed pedestal chargers on parking pads where the garage is too tight to park. Every run gets sized for voltage drop, which matters more on these long hillside runs than people expect. We also install all weather outdoor chargers with proper GFCI protection for driveway and carport setups.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Kensington
We install and service chargers from Tesla, Enphase, ChargePoint, and the FranklinWH integrated home energy system. If your charger came with your solar system or you bought it from a manufacturer directly, we can usually wire it, commission it, and pull the permit. Because we stock common hardware and breakers for the panel types found in Kensington’s older homes, we don’t have to send a runner to a supply house in Richmond mid job. That keeps the work moving and the price where we quoted it.
Common EV Charger Installation Problems We See in Kensington Homes
- Original 60 to 100 amp panels failing under load. Kensington’s pre-1960 building stock was wired for a different era. A Level 2 charger needs its own 40 to 60 amp breaker, and the old panels simply do not have the bus rating or the spare slots. The county’s NEC 625 load calculation almost always requires an upgrade before the permit is issued.
- Salt air corrosion on garage hardware interfering with charger cable routing. The marine layer that funnels through the Golden Gate settles into Kensington garages and eats through unpainted steel. Garage door tracks and opener chains corrode, the door sticks or seizes, and the charger cable ends up pinched or rubbing against rusted metal. We use coated springs, stainless fasteners, and corrosion resistant conduit fittings on every Kensington job.
- Steep driveway and hillside conduit runs. Lots off Arlington and along the ridge often drop 6 to 10 feet from the panel to the garage. That means longer underground or surface conduit runs, additional junction boxes, and grounding considerations that flat lots in El Cerrito never deal with. We build these runs into the quote up front.
- Unpermitted chargers failing county inspection on resale. We regularly meet Kensington homeowners whose previous owner wired a charger without a permit. The county’s plan check now catches WUI setback violations and rapid shutdown gaps that a Berkeley or El Cerrito inspector might not flag. We correct the work and pull the proper permit so the home can sell clean.
Pricing for EV Charger Installation in Kensington, CA
Here are the real numbers for Kensington’s market. A Level 2 charger installation with an existing adequate panel runs $1,100 to $1,800. A Tesla Wall Connector install with a 200 amp panel already in place runs $1,300 to $2,200. A panel upgrade from 100 to 200 amps runs $2,700 to $4,500. Pairing an EV charger with a solar and battery system, which we do often for Kensington homeowners who want to charge from their own production, typically adds $1,200 to $2,000 to the charger scope. A full service upgrade plus charger plus solar ready wiring in this area runs $4,500 to $7,000 all in.
What moves the price in Kensington specifically: the age of your panel, the distance from the panel to the garage, whether the meter is on the hillside side of the house, and whether county inspection requires WUI fire code setbacks that add conduit and junction boxes. No trip charge inside our own county. Free estimate on every call.
We Also Serve Cities Near Kensington
We work throughout the East Bay hills and flats, including Kensington, El Cerrito, Albany, Richmond, and Berkeley. If you’re just over the county line, the permitting process changes, and we handle that too. Call us and we’ll tell you which building department covers your address.
Serving Kensington, CA - Our Local Coverage Area
We’re based in the Kensington area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Kensington
Kensington is not a city. It is unincorporated Contra Costa County, so there is no City of Kensington building department. Your EV charger permit goes through the Contra Costa County Building Department, which has different inspectors, longer scheduling, and stricter WUI fire code requirements than Berkeley or El Cerrito. We pull the permit for you and handle the county inspection entirely. Call (877) 550-6892 and we’ll confirm which jurisdiction covers your address.
Your original panel is almost certainly rated for 60 to 100 amps, and a Level 2 charger draws 32 to 48 amps continuously. The county’s load calculation compares that continuous draw against your existing circuits, and on Kensington’s older homes the numbers simply do not work. The county will not sign off on the permit without the upgrade. We’ll show you the calculation and the panel rating before you commit to anything.
Yes, and we design solar paired EV charging systems specifically for Kensington’s marine layer pattern. Your panels produce less during those summer afternoons when the fog pours through the Golden Gate, so we size the system around your actual annual production curve, not a generic Bay Area average. SolarEdge and Enphase optimizers help with the partial shading from oaks and eucalyptus on your hillside lot. Gus quotes the year 25 output, not the day one brochure number.
Salt air corrosion affects garage door hardware before it affects a hardwired EV charger, but it can shorten the life of exposed conduit fittings and any charger mounted outdoors on the driveway. We use corrosion resistant fittings, galvanized conduit, and sealed outdoor enclosures on Kensington jobs. If your garage door tracks are already rusted, it is worth addressing them now before they seize and pinch a charger cable. Call us for a free estimate, and we’ll inspect both the charger path and the door hardware.
County inspections in Kensington typically take two to four weeks to schedule, which is about double the timeline in neighboring cities like El Cerrito or Berkeley. We factor that into our project schedule and keep the permit moving through plan check so you are not waiting on us. We also handle the re inspection if the county flags anything.
Ready to get a quote? Call us at (877) 550-6892. A live person answers 24/7, and we’ll come out to Kensington, look at your panel, your garage, and your driveway, and give you a number that will not change. No pressure. Take two weeks. The price will be the same.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Kensington and the East Bay hills with local, owner operated solar and EV charging work since 2011.






Before
After
Before
After
Before
After