Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Joshua
EV charger installation in Joshua, TX typically costs between $450 and $2,800 depending on your panel’s existing capacity, the distance from your breaker box to where you park, and whether your home needs a service upgrade first. Most jobs take one day. Gus’s Solar has been wiring chargers across Johnson County long enough to know that a 1980s ranch on North Broadway Street presents a very different job than a 2022 tract home south of Joshua Station. Call (877) 550-6892 for an honest number based on your actual house, not a brochure.
Why Gus’s Solar Is Joshua’s Preferred EV Charger Installation Company
Joshua is not Burleson. The housing stock is older in spots, the lots run bigger, and the electrical infrastructure reflects decades of piecemeal additions rather than a single builder’s spec sheet. Gus Petrakis has walked enough attics off County Road 913 to know the difference between a clean 200-amp panel and a Zinsco that should have been pulled fifteen years ago. That local literacy saves Joshua homeowners from surprises on install day.
Customer reviews from the Joshua area point to the same thing: the quote matched the invoice. That matters when you are comparing a local owner-operated shop against out-of-state outfits that send a salesman from Dallas with a tablet and a deadline. We publish our address, our license, and Gus’s name. You will find us at the hardware store. You will not find a call center.
Response time to Joshua runs same-day for most estimates. A service call from our Dallas-Fort Worth office to the 76058 zip code is a straight shot down 35W, and our scheduling is built around Johnson County runs so we are not routing someone in from Fort Worth at 4:30 in the afternoon. If you need a charger quoted, we show up when we say we will.
Every install is done by Gus’s own crew. Background-checked, uniformed, and paid hourly, not by the job. That means no one is racing to the next ticket by cutting corners on your panel or your conduit. The 90-Day Done Right Promise is in writing on every job. If it is not right, Gus makes it right.
Our EV Charger Installation Services in Joshua
Level 2 Charger Installation
A Level 2 charger is the practical choice for most Joshua drivers. It charges at 240 volts and adds roughly 20 to 40 miles of range per hour, depending on your vehicle and the charger’s amp rating. In Joshua, the main variable is your panel. Homes built before 1990 often carry 100-amp or 125-amp service, and a 48-amp charger pulls enough current that the main breaker can trip the moment the AC compressor and dryer kick on together. We run the load calculation first, then tell you honestly whether the panel can handle it.

Tesla Wall Connector Installation
Tesla Wall Connectors are straightforward gear, but they are picky about wiring and breaker sizing. In Joshua’s older ranch homes, the dedicated 60-amp circuit a Wall Connector wants often requires a subpanel or a service upgrade. In newer subdivisions along Conveyor Drive, we still see builders who never left room in the panel for EV charging. We install Tesla Wall Connectors alongside any EVSE brand, and we wire them so a future charger swap does not require opening the wall again.

Panel Upgrade for EV Charging
This is the most common add-on we quote in Joshua, and it is where the older housing stock shows its age. A 1978 home with a 100-amp Federal Pacific or Zinsco panel is not a candidate for a 60-amp charger circuit until that panel comes out. We replace it with a modern 200-amp service, bring the grounding and bonding up to current code, and leave inspection-ready work. On half-acre lots with detached garages, this often means a new feeder run and a ground rod at the outbuilding, which is a detail national installers routinely miss.

Garage & Driveway Charger Wiring
Detached garages are common in Joshua, and they add real complexity. Many were wired decades ago for a single light bulb and a door opener, with no ground rod and undersized conductor. We run the proper feeder, install disconnects where code requires, and keep exterior conduit clean and tight. For driveway charging, we use in-ground rated conduit and weatherproof enclosures so the install stands up to Johnson County summers and spring hail season.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Joshua
Gus’s Solar works with the chargers and energy hardware Joshua homeowners actually ask for. Tesla Wall Connectors, Enphase, FranklinWH, and SolarEdge are all in our regular toolbox. If your charger is integrated with a solar-plus-battery system, matching inverter and charger brands matters for monitoring and backup behavior. We keep common breakers, disconnects, and conduit fittings on the truck, so a Joshua job does not stall while we run back to a parts house. That is one benefit of a local crew that stocks for the market it serves.
Common EV Charger Installation Problems We See in Joshua Homes
- Undersized main panels on 1970s-1980s ranch homes. A 100-amp or 125-amp panel cannot absorb a 48-amp charger load while the rest of the house is running. We see tripped mains and scorched breakers on homes where someone tried to force a Level 2 charger onto legacy service.
- Detached garages without a proper ground rod. On multi-acre lots, an outbuilding often shares only two hots and a neutral with the main house, no equipment ground. That causes charger faults, nuisance GFCI trips, and a genuine electrical hazard. We fix the grounding before we mount anything.
- HOA restrictions on exterior conduit in newer Joshua subdivisions. Some neighborhoods in and around Joshua Station prohibit visible conduit on street-facing walls. That forces trenching or interior routing, which changes the quote. We check covenants before we finalize a design, so there are no surprises with a compliance committee.
- Zinsco and Federal Pacific panels still in service. We still pull these out of Joshua homes regularly. They are known fire hazards, they do not trip reliably, and they cannot safely support EV charging loads. If your panel says Zinsco, the charger conversation starts with the panel.
Pricing for EV Charger Installation in Joshua, TX
A straight Level 2 install in Joshua, where the panel has open capacity and the charger mounts within 15 feet of the breaker box, runs $450 to $900. Add a subpanel for a detached garage and you are looking at $1,200 to $2,000 depending on distance and trenching. A full 200-amp service upgrade, which includes the meter base, panel, grounding, and inspection, lands between $2,200 and $3,800 in this market. Tesla Wall Connector installs do not cost more for the wiring; the unit itself is the equipment expense. Solar-paired charging, where your EV draws from panels and battery during an outage, adds design and hardware but often qualifies for the same 30% federal credit as the solar array. Call (877) 550-6892 for a free estimate built on your actual panel, your actual garage, and your actual bill. The price we quote is the price you pay. Take two weeks to think about it. The number will be the same.
We Also Serve Cities Near Joshua
Our crews run regular routes through Keene, Burleson, Crowley, and Cleburne, so scheduling in Joshua is a short drive, not a service-area afterthought. If you are nearby and want the same local, no-pressure approach, see our full EV Charger Installation service details or call (877) 550-6892.
Serving Joshua, TX - Our Local Coverage Area
We’re based in the Joshua area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Joshua
Yes, it typically adds two to four weeks. Your charger itself is not what Oncor reviews, but when you pair it with a solar array, the combined system must clear Oncor’s interconnection application before we energize the tie-in. Oncor’s approval list for inverters is specific, and their queue in Johnson County moves at its own pace. We start the paperwork the week you sign, so the solar and the charger are not sitting idle waiting on each other. Call (877) 550-6892 and we will lay out a realistic timeline.
You can, but usually not without upgrading the panel or adding a subpanel. A 100-amp main service will not sustain a 48-amp charger while the house is cooling, cooking, and drying clothes. We run a load calculation, and if the panel is the limiting factor, we quote a 200-amp service upgrade or a dedicated subpanel feed to the garage. The garage side needs proper grounding too. Call (877) 550-6892 for a straight answer after we look at your panel.
Short answer: maybe. Some newer Joshua subdivisions restrict visible conduit or wall-mounted equipment on street-facing elevations. Others do not care as long as it is painted to match. We check your covenants before we finalize the design, and we will route the conduit inside the wall or through the attic if that is what your HOA requires. It is simpler to plan around the rule than to fight it after install.
Because building codes are enforced at the city level, and Joshua’s inspection office has its own expectations. But load calculations are not a bureaucratic formality. They are how we know whether your panel and service entrance can safely carry the additional continuous load. A Burleson home built in 2015 with a 200-amp panel is a much easier yes than a 1978 Joshua ranch with a 100-amp main. We do the calculation on every charger job regardless of what the neighboring city does.
Yes. That configuration requires a battery system because solar panels alone cannot provide stable, isolated power during an outage. We design the charger circuit as an essential load backed by the battery, with a transfer switch that isolates your system from the grid when Oncor’s power drops. This is what we do with FranklinWH, Enphase, and Tesla Powerwall setups. During a winter event like 2021, a charged EV plus a battery-backed house is a meaningful form of resilience. Call (877) 550-6892 and bring your most recent bill. Gus will bring the math, including year-25 output numbers, not just the day-one brochure figure.
How Oncor, Older Panels, and HOAs Shape EV Charger Installs in Joshua
Joshua sits in Oncor’s transmission and distribution territory, which is a fact that affects every grid-tied charger we install. The interconnection review adds lead time that homeowners in smaller Johnson County cities often do not see coming, especially on half-acre lots where a separate meter for the garage is common. That metering setup is its own wrinkle: a garage with its own service drop may not need to pull from the house panel at all, which can actually simplify the install and lower the cost. But it has to be permitted and inspected through Oncor’s process on the same timeline as any other grid connection. We set those expectations before we quote, not after you have already bought the charger.
The second Joshua-specific factor is the housing stock. The older ranch homes scattered along North Broadway Street and the county roads around 76058 were built when a household had one television and no EV. A 60-amp circuit for a car was not on the drawing in 1979. The newer tract homes south of Joshua Station have their own issue: builders who wired exactly to minimum code, leaving no spare capacity for EV charging. We handle both ends of that spectrum. At an 1980s ranch off North Broadway Street, our crew replaced a failing Zinsco subpanel with a new 200-amp service to feed a Tesla Wall Connector in the detached garage. The original wiring had no room for a 60-amp breaker, so we ran 80 feet of 6/3 THHN through the attic and used a NEMA 14-50 outlet to keep the installation flexible for future charger swaps. That is the kind of job a drive-by quote will get wrong every time.
And then there is the hail. North Texas is hail country, and Johnson County does not get a pass. For chargers mounted outdoors on a post or an exterior wall, we use weathertight enclosures and protect the unit the same way we would a solar array: rated for impact, documented for your insurance file. The charger itself is not the biggest hail risk, but the conduit, disconnect, and mounting hardware are all outdoors, and they are all part of the install we warranty.
L.O.C.A.L. values get talked about a lot in marketing, but here is what they look like on a Joshua job: Local roots means Gus is a phone call away, not a ticket number. On time means we show up when the schedule says we will, because you arranged your day around us. Community first means we do the job right for the neighbor we will see at the store. Accountable means the 90-Day Done Right Promise is written, not implied. Loyal means we answer the phone at 2 a.m. when a breaker trips and your car is not charged for work. That is what we sign up for when we take your job.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Joshua and Johnson County with straight answers and honest wiring since day one.






Before
After
Before
After
Before
After