Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Century City
If you live in a Century City high-rise and drive an EV, you already know the frustration: no charger in your deeded parking space, a building that says “we’re looking into it,” and a daily scramble for public charging. Gus’s Solar installs Level 2 and Tesla Wall Connectors in Century City condos, office towers, and commercial parking decks. We know the HOA process, the LADWP commercial interconnection queue, and the structural realities of mid-century parking structures. Call (877) 550-6892 and you’ll get Gus or a member of his crew, not a call center.
Why Gus’s Solar Is Century City’s Preferred EV Charger Installation Company
Most EV charger installers in Los Angeles think the job ends at the breaker panel. In Century City’s 90067, that’s where the real work begins. We’ve sat in HOA board meetings at towers along Avenue of the Stars. We’ve walked aging parking decks with structural engineers to confirm a 48A circuit won’t overload a 1960s feeder. We’ve waited in LADWP’s commercial interconnection queue longer than some companies have been in business.
Gus Petrakis founded this company in 2011 and still puts his own name on the truck. When a Century City building manager calls about a charger that tripped a breaker at 2 a.m., a live person answers. Not a voicemail. And if the installation isn’t done right, the 90-Day Done Right Promise means Gus comes back and makes it right. That matters in a place like Century City, where building relationships with boards and management firms takes years, not one sales call.
Our EV Charger Installation Services in Century City
Level 2 Charger Installation
A Level 2 charger in a Century City condo garage typically runs $1,400 to $2,800, including the unit, circuit, conduit, and labor. The catch is that most of Century City’s residential towers assign parking in shared structures where the HOA owns the electrical infrastructure. We handle the load calculations, the board presentation package, and the installation. If your board wants an electrical study before they’ll even discuss your request, we can produce that too.

Tesla Wall Connector Installation
Tesla owners in Century City often assume a Wall Connector installs like a phone charger. It doesn’t. A 48A Wall Connector on a dedicated 60A circuit pulls real current, and in a mid-century parking deck with 60-100A legacy service per floor, that load matters. We’ve done these installs in buildings where the board required proof that the existing service could handle the draw before a single foot of conduit went up. Typical cost in Century City: $1,600 to $3,200 depending on conduit run length and panel accessibility.

Panel Upgrade for EV Charging
If your Century City condo’s panel is original to a 1960s tower build, it’s almost certainly undersized for today’s EV loads. A panel upgrade in Century City runs $2,800 to $5,500 for the panel and labor, and in shared buildings, we coordinate with the HOA to minimize disruption to neighbors. The biggest variable is whether the building’s main service has capacity left or whether the utility side needs attention. In older Westside towers, it often does.

Garage & Driveway Charger Wiring
Wiring a charger in a Century City garage means running EMT conduit across common-area ceilings, through fire-rated walls, and into a panel that may sit two floors away from your parking space. The conduit run is the difference between a $1,400 job and a $3,000 job. We measure, we quote, and the number you see is the number you pay. Bring us your board’s requirements and we’ll build the estimate around them.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Century City
We install and service chargers from Tesla, Enphase, SolarEdge, and FranklinWH, plus full integration with Panasonic and Canadian Solar systems where solar-paired charging makes sense. For Century City customers, we keep common Tesla Wall Connector components and Enphase monitoring hardware on the truck, which means fewer follow-up visits. If your charger is older or the brand is off the beaten path, we’ll tell you honestly whether it’s worth repairing or whether you’re better off with a newer unit.
Common EV Charger Installation Problems We See in Century City Homes
- HOA roadblocks on common electrical infrastructure. Most Century City condo owners don’t realize their deeded parking space is inside a building where the HOA controls every circuit serving the garage. A charger taps that common infrastructure, and the board’s governing docs often require formal approval before any work begins. We prepare the documentation boards actually ask for.
- Aging mid-century parking deck electrical service. Towers built in the 1960s and 1970s along Avenue of the Stars often have 60-100A legacy service per floor. Add two or three Level 2 chargers and the garage lighting flickers, gate openers do weird things, and breakers start tripping. A load study identifies whether the floor can handle additional draw before you spend on hardware.
- LADWP commercial interconnection delays for solar-paired charging. If you’re planning to pair an EV charger with a building solar array in Century City, expect LADWP’s commercial interconnection process to move slower than residential. Projects that assume residential timeline often sit for months waiting on utility review. We start the paperwork early and set realistic expectations.
- Shared-wall and common-area conduit disputes. Running conduit through a parking deck means crossing space owned by the association, not just your unit. Neighbors notice new conduit, and boards sometimes push back if a previous owner made a mess. Our crew runs clean, labeled, code-compliant conduit and leaves common areas looking better than we found them.
Pricing for EV Charger Installation in Century City, CA
A straightforward Level 2 installation in a Century City condo garage runs $1,400 to $2,800. A Tesla Wall Connector with a longer conduit run or panel upgrade lands between $1,600 and $3,200. Panel upgrades specifically for EV charging run $2,800 to $5,500, and building-wide commercial EV charging projects start around $8,000 per dual-port station, before any LADWP incentive offset. The variables in Century City are almost always HOA-related: load studies, engineering sign-offs, and common-area access fees. We provide line-item estimates so you can see exactly what’s driving cost. Call (877) 550-6892 for a free estimate, and take two weeks to think about it. The price will be the same.
We Also Serve Cities Near Century City
Our EV Charger Installation team serves Century City and the surrounding Westside. We’re regularly on job sites in Beverly Hills, Culver City, West Hollywood, and Santa Monica. If you’re just outside the 90067 and need charger work, call (877) 550-6892 and we’ll tell you straight up whether we can get to you this week.
Serving Century City, CA - Our Local Coverage Area
We’re based in the Century City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Century City
Yes. Almost always. Even if your parking space is deeded to your unit, the wiring that feeds it runs through the building’s common electrical infrastructure, which the HOA controls. Century City boards routinely require a board vote or at minimum written management approval before any charger installation. We can draft the request package, include the load calculations, and attend the board meeting if that helps move things along. Call (877) 550-6892 and we’ll walk you through your building’s specific process.
Yes. Century City sits in the Westside marine layer corridor, and from May through July the morning overcast measurably suppresses solar output compared to inland LA. In a solar-paired EV charging design for 90067, we use Westside-specific production numbers, not generic Los Angeles averages. If a proposal quotes you inland irradiance numbers, that’s a red flag. We build Century City estimates off actual coastal shading patterns so the year-25 output number is honest.
Realistically, plan on three to six months from application to approval for commercial interconnection through LADWP in Century City, and that’s if the paperwork is complete when it’s submitted. Residential timelines don’t apply here. Projects stall most often because of incomplete load data or engineering review delays. We handle the submission and follow-up so building managers aren’t chasing utility status updates.
Yes, we can. Office towers along Avenue of the Stars and Constellation Boulevard call us for valet-area charger installations regularly. The main considerations are the building’s commercial service capacity, the valet operator’s access needs, and whether the tower management wants billing or metering per station. We install standalone Wall Connectors and networked multi-port setups depending on the building’s requirements. Call (877) 550-6892 and we’ll come out, look at the parking deck, and give you a straight answer.
Yes, it’s possible. We coordinate panel upgrades in Century City condo buildings to minimize downtime, and in most cases, we can isolate the work to your service without cutting power to neighboring units for more than a brief window. The bigger question is whether the building’s main feeder has spare capacity. If it doesn’t, the scope changes, and your board will need to be involved. We’ll tell you honestly after looking at the panel and the building’s service equipment.
Call Gus’s Solar for EV Charger Installation in Century City
If you live in Century City and you’re tired of waiting for your building to sort out its EV charging plan, call (877) 550-6892. We’ll come out, look at your parking situation, and tell you what’s actually possible in your building. No pressure, no “sign tonight” pitch. Bring us your HOA’s rules, your panel photos, and your questions. We’ll give you a real number and time to think about it. If a salesman needs an answer tonight, the answer is no. That’s not how we work, and it never has been.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Century City and the Westside with straight answers since 2011.






Before
After
Before
After
Before
After