Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Burbank
EV charger installation in Burbank typically costs $600-$2,400 for a standard Level 2 unit, with the final number driven by three things we see every week here: the age of your electrical panel, the distance from that panel to where the car parks, and whether Burbank Water and Power needs to sign off on a service upgrade. We live here. We know which Burbank streets still have original 100-amp panels and which ones got upgraded in the 1990s remodel wave. Call (877) 550-6892 and you’ll get a straight answer, not a call center.
Most Burbank homes were built between 1935 and 1965. That matters for charger installation more than any other factor. A 1948 ranch near Magnolia Park needs a different approach than a 1998 townhouse in Rancho Adjacent. We don’t guess. We look. Then we tell you what it actually costs.
Why Gus’s Solar Is Burbank’s Preferred EV Charger Installation Company
Gus Petrakis put his name on the truck, and that changes how the work gets done. We’ve been installing EV chargers and solar across Burbank long enough to know that half the bids our customers receive from other outfits fall apart on inspection day. The panel won’t pass. The wire gauge is wrong. The permit never got pulled. We see it monthly.
Our reputation in Burbank comes from doing the opposite. We show up when we say we will. The quote is the price. If something is not done right, Gus makes it right. Every EV charger installation is backed by the 90-Day Done Right Promise in writing. No fine print. No chasing a national call center for a warranty claim. One call brings Gus back.
Calls are answered by a live person 24/7. Not a voicemail. Not a ticketing portal. You call, a person picks up. When you need a charger installed before a new EV shows up on Tuesday, that matters. Background-checked, uniformed technicians do the work. Gus’s own crew. Not a sub. Not a rotating cast of day laborers. The same people who install solar on Burbank rooftops install the chargers.
Our EV Charger Installation team works in Burbank every week, so scheduling is usually a matter of days, not weeks. For anything urgent, we can often be there same day. And every estimate is built off your actual electrical panel and your actual parking situation, not a brochure number.
Our EV Charger Installation Services in Burbank
Level 2 Charger Installation
Most Burbank homeowners choose a Level 2 charger because it adds 25-30 miles of range per hour. A standard installation on an existing 240V circuit in a garage runs $600-$1,200. If we need to run a new circuit from the panel, expect $1,200-$2,400. On the 1940s and 1950s homes common around Chandler Bike Path and the streets off Victory Boulevard, we often need to evaluate the panel before we can commit to a number. We’ll tell you that on the first call.

Tesla Wall Connector Installation
For Tesla owners in Burbank, the Wall Connector is the cleanest setup. It charges at up to 48 amps, which adds about 44 miles of range per hour. Installation ranges from $800-$1,800, depending on whether a dedicated 60-amp circuit already exists. We bid a Tesla Wall Connector on a 1949 bungalow near North Griffith Park Drive in 91504 recently. The original 100-amp Zinsco panel and cloth-wrapped wiring couldn’t safely support the 48-amp continuous draw, so we upgraded the service to 200 amps and installed a dedicated 60-amp circuit to avoid nuisance tripping on a legacy panel. That job came in at the top of the range because of the panel work. On a newer home near Verdugo Avenue, the same charger went in for under a thousand.

Panel Upgrade for EV Charging
Burbank’s post-WWII housing stock was built mostly with 100-amp or even 60-amp service. A modern EV charger can draw 48 amps continuously. Add a central AC unit pulling 20-30 amps on a 105-degree San Fernando Valley afternoon, and the math stops working. A panel upgrade to 200 amps in Burbank typically runs $2,500-$4,500, including BWP permitting and the new meter base. It’s the single most common add-on we quote. If your panel is a Zinsco, Federal Pacific, or split-bus design from the 1940s-1960s, we’ll recommend replacing it before adding any charger. Not because we want the extra work. Because we don’t want a fire on Magnolia Blvd.

Garage & Driveway Charger Wiring
Detached garages are common in Burbank’s older neighborhoods, and many of them still share a subpanel with the house. Running a new 240V line from the main panel to a detached garage typically costs $900-$1,600, depending on trenching distance, conduit run, and whether the old subpanel needs reconductoring. Driveway chargers, where you park outside and run the charger to a post or wall-mounted unit, usually land in the same range. We handle the conduit, the wiring, the weatherproofing, and the BWP permit. You plug in and drive.

Solar-Paired EV Charging
Burbank gets more sun-hours than the coast, and our valley heat pushes AC loads hard enough that solar payback here runs faster than in cooler parts of LA. Pairing your EV charger with a solar array means your car fuels itself off production that would otherwise flow to the grid at BWP’s export rate. But BWP runs its own net metering program with a finite enrollment cap. Before we quote a solar-paired charger in Burbank, we check available NEM capacity through BWP directly. A company working off Southern California Edison assumptions will hand you a proposal that’s wrong on price and wrong on timeline. We do the due diligence others skip. That’s the difference between a true-up statement you’re happy to open and one that ruins your January.

Commercial EV Charging Stations
For Burbank businesses along Burbank Boulevard or in the media district around Alameda, we install Level 2 stations for employee and customer use. Commercial jobs run $3,000-$10,000 per port, depending on trenching, panel proximity, and whether you need load management. We handle the BWP commercial interconnection paperwork. We’ve done them. We know who to call at the utility.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Burbank
We install and service chargers from Tesla, Enphase, and SolarEdge, and our solar-paired EV charging work often pairs with Panasonic, Canadian Solar, and FranklinWH equipment. One thing to weigh in Burbank specifically: parts availability. Some contractors quote equipment they don’t actually stock, which means a failed inverter or charge controller leaves you stranded for two weeks while a warehouse in Texas ships it. We keep the components we install in local inventory for Burbank customers. If something fails under warranty, we swap it. Same week. That’s not a promise we make lightly, and it’s one we can keep because we’re rooted here, not dispatching from a regional call center.
Common EV Charger Installation Problems We See in Burbank Homes
Every city has its own failure patterns. Here’s what we find on Burbank jobs that we rarely see in newer developments:
- EV charger circuit shares a busbar with an aged 100-amp split-bus panel. In Burbank’s 1950s ranch houses, this is the single most common issue. On hot afternoons when the AC pulls hard, the main trips and the charger goes dark. The fix is usually a service upgrade, not a band-aid.
- Old clay-tile roof penetrations allow attic heat to bake conduit runs. Many Burbank homes still have original clay tile or low-slope composition roofs, and when conduit runs through an attic that hits 140°F in the valley summer, the insulation on charger wiring degrades faster than it should. We see this on houses around the Verdugo foothills and the streets off Kenneth Road. If we’re installing on an older roof, we’ll route the conduit to avoid the worst heat zones and let you know whether the roof needs attention before the charger does.
- Incorrectly assuming SCE net-metering rates for solar-paired charging. Burbank is served by Burbank Water and Power, a municipal utility entirely separate from Southern California Edison. Every solar installation here requires BWP-specific interconnection applications and net metering agreements. The export rates are different. The rate structure is different. If your installer uses SCE math, your first true-up statement will disappoint you. We’ve corrected for this mistake on other contractors’ jobs in Burbank more times than we can count.
- Detached garages still running on a 60-amp subpanel with cloth wiring. Burbank’s alleys are lined with small detached garages built in the 1940s, and many of them still carry 60-amp subpanels fed by fragile cloth-insulated wire. Connecting a 48-amp charger to that setup risks overheating the feeder. A subpanel upgrade or a dedicated new run from the main service is almost always required. We’ll test the existing wiring before we touch anything.
Pricing for EV Charger Installation in Burbank, CA
Here’s what Burbank homeowners actually pay, based on the jobs we’ve completed across 91501, 91502, 91504, 91505, and 91506:
- Standard Level 2 installation on an existing 240V circuit: $600-$1,200
- Level 2 installation requiring a new dedicated circuit: $1,200-$2,400
- Tesla Wall Connector installation: $800-$1,800 (higher when panel work is needed)
- 200-amp service panel upgrade (for Burbank homes with 100-amp legacy panels): $2,500-$4,500
- Detached garage wiring run (new circuit from main panel): $900-$1,600
- Solar-paired EV charging (charger plus panel input, solar array quoted separately): $2,000-$4,000 for the charger and integration
BWP’s municipal NEM cap and the age of Burbank’s electrical panels are the two biggest price drivers we see. A house built in 1998 can absorb a Level 2 charger with a clean install under $800. A 1949 bungalow needs a panel upgrade, a wire run, and a permit, and that lands closer to $4,000 all-in. We’ll give you the real number before any work starts. Senior and veteran customers get a 10% discount that never expires. Estimates are free. Every quote is valid for two weeks, and we don’t expect a signature tonight.
We Also Serve Cities Near Burbank
If you’re in Universal City, North Hollywood, Glendale, or Studio City, we work there too. The electrical grids and housing stock are different, but the standard is the same: honest numbers, permit-ready work, and a live person answering the phone when you call. For a closer look at how we approach EV Charger Installation in Burbank, start with a free estimate.
Serving Burbank, CA - Our Local Coverage Area
We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Burbank
Because Burbank Water and Power is a municipal utility with its own interconnection application, net metering approval process, and electrical service upgrade requirements. BWP’s approval typically adds 1-3 weeks to a charger project when a service upgrade or solar-paired installation is involved. We’d rather tell you that upfront than promise a two-day install and then sit waiting on a BWP review. Call (877) 550-6892 and we’ll tell you exactly what your BWP paperwork will require.
No, if the panel is original and the wiring is cloth-insulated. A 48-amp continuous draw from a Wall Connector on a 100-amp panel leaves almost no headroom for AC, range, or dryer loads, and on valley heat days the main will trip routinely. Most Burbank bungalows need a 200-amp service upgrade before a 48-amp charger is safe. It’s the right fix and BWP will require it for the permit.
Yes, and we see it in Burbank faster than in coastal neighborhoods. Triple-digit valley heat accelerates thermal degradation in chargers, conduits, and wiring insulation, especially when attic temperatures exceed 140°F for weeks at a time. Choosing equipment with good thermal margins and routing wiring away from unconditioned attic space adds years to the install. We account for Burbank’s heat in every estimate we write.
It depends on whether BWP’s current NEM program still has capacity when you file, and what the export compensation rate is at that moment. Unlike SCE, BWP’s NEM cap is finite. When slots are gone, the economics shift. Before we quote solar-paired charging in Burbank, we check available BWP capacity and run the numbers against your real utility rate, not a generic assumption. That due diligence is what separates a true-up you open calmly from one you open in January and regret.
Usually not safely. If the feeder wire from the main panel to the detached garage is original cloth-insulated 60-amp cable, adding a 48-amp charger will overheat it. A new dedicated 240V circuit run from the main panel is the standard fix. Detached garages are common in Burbank’s older neighborhoods, and we’ve done this exact job on alley-facing garages across the city. Call (877) 550-6892 for a free look at yours.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Burbank since 2011.






Before
After
Before
After
Before
After