Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Brushy Creek
If you live in Brushy Creek and you’ve just brought home an EV, the first question is usually the same: how fast can I get a charger on my wall? The answer in this part of Williamson County is typically two to four business days, depending on whether your panel needs work. Most Level 2 charger installs in Brushy Creek run $850 to $1,600 when the panel has spare capacity, and $3,500 to $5,500 when a 200-amp panel upgrade is part of the job. Call us at (877) 550-6892 and we’ll give you a straight number after a phone call and a few photos, not after a two-hour sales visit.
Gus’s Solar has installed chargers in nearly every subdivision in the 78717 ZIP, from Oak Brook to Cat Hollow and Sendero Springs. We know the homes here, and we know what the HOAs will and won’t let you put on a garage wall. That local knowledge saves you from paying for a rework when the design-review board flags a conduit run you didn’t know was a problem. Our EV Charger Installation team handles everything from a simple 240-volt outlet to a full panel replacement, and we don’t hand work off to subcontractors. The same crew that answers your call is the one that shows up in your driveway.
Why Gus’s Solar Is Brushy Creek’s Preferred EV Charger Installation Company
Gus Petrakis founded this company in 2011, and he still runs it the same way he did on day one: his name is on the truck, his phone number is published, and a live person picks up 24/7. In Brushy Creek, that matters. Homeowners here have dealt with out-of-state solar and electrical outfits that quote one number over the phone and a different one at the door. That’s not how we work. The price we quote is the price on the invoice, and no one is going to ask you to sign anything before you’ve had time to think it over.
We’ve worked on enough Brushy Creek homes to know the quirks: the 1997-2010 tract builds with original 100-amp panels, the HOA covenants that say “not visible from the street,” the two-story floorplans that make attic conduit runs a little more involved. That experience means we show up with the right parts the first time and don’t waste your afternoon with a return trip. When a Brushy Creek customer calls us back because something isn’t right, Gus comes back himself. That’s the 90-Day Done Right Promise in writing on every job, and it’s been that way since 2011.
Our EV Charger Installation Services in Brushy Creek
Level 2 Charger Installation
A Level 2 charger is the practical choice for Brushy Creek drivers. It adds roughly 25 to 44 miles of range per hour, which means you’re full before morning without ever visiting a public station. Most Brushy Creek garages we see need a dedicated 240-volt circuit run from the panel to the charging location. In homes built between 1997 and 2010, that often means fishing wire through the attic or along an interior wall. We handle the whole install, from permit paperwork (Williamson County requires one) to a clean, tested connection.

Tesla Wall Connector Installation
We install the Tesla Wall Connector regularly in Brushy Creek, and it’s one of the cleanest setups for a Model 3, Model Y, or any Tesla on a 78717 driveway. The Wall Connector pulls up to 48 amps on a 60-amp circuit and works with the Tesla app for scheduled charging. We mount it where it makes sense for your garage layout, and if your HOA has visibility restrictions, we’ll put it on an interior wall or use concealed conduit so nothing trips the design-review process. You don’t need to be an electrician to figure this out; we’ll look at your panel and tell you what’s possible.

Panel Upgrade for EV Charging
This is the one that catches a lot of Brushy Creek homeowners off guard. The original panels in many of these 15-to-25-year-old homes are 100 amps, and that’s before you add a charger that can pull 48. If you’ve got an electric dryer, central AC, and an EV charger all on a 100-amp panel, you’re going to trip the main breaker on a July afternoon. A 200-amp panel upgrade in Brushy Creek typically runs $2,800 to $4,200, and it’s a one-day job in most cases. We do the load calculation first and only recommend the upgrade if the math shows you actually need it.

Garage & Driveway Charger Wiring
Whether your charger lives inside the garage or on a post at the top of the driveway, the wiring is what decides whether the install passes inspection. In Brushy Creek, we’ve seen plenty of homeowner-installed jobs fail because the conduit was undersized, the breaker was wrong, or the run was too long for the wire gauge. We run the correct conductor, size the breaker to the charger’s actual draw, and label everything. If you want a driveway-mounted charger, we’ll dig the trench, run the conduit, and set a post that won’t wobble in Williamson County clay.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Brushy Creek
We install and service chargers from Tesla, Enphase, and ChargePoint, along with most other major brands. If you’ve already bought a charger and it’s sitting in the box, we’ll wire it up. If you’re starting from scratch, we’ll recommend what fits your panel and your driving habits, not what earns us the biggest margin. For Brushy Creek customers with an existing Enphase solar system, we can integrate your charger so it pulls cleanly from your array during peak sun hours, which keeps your net metering credits from shrinking faster than they should. We keep common parts stocked in our Austin office, so a Brushy Creek job rarely waits on a backordered component.
Common EV Charger Installation Problems We See in Brushy Creek Homes
- The original 100-amp panel gets overloaded. Homes built between 1997 and 2010 in Brushy Creek often shipped with 100-amp service. Add a 48-amp charger to a house already running central AC and an electric dryer, and the main breaker starts tripping on hot afternoons. We run a load calculation before we touch anything.
- HOA visibility covenants get violated. Many Brushy Creek subdivisions have design-review language that prohibits equipment “visible from the street.” A charger mounted on the front-facing garage wall with surface conduit can trigger a rework order. We plan the route before we drill.
- The installer skips the load management device. On an older panel, a Level 2 charger plus house loads can exceed the busbar rating, which is a code violation. A load management device or a panel upgrade fixes it. Some installers skip it to keep the quote low and let the inspector catch it later. We don’t.
- Wire gauge gets undersized for the run. A long run from the panel to the garage needs thicker wire to carry 48 amps safely. In a two-story Brushy Creek house, that run can be 80 feet or more. Undersized wire overheats and fails inspection. We size the conductor to the distance, every time.
We installed a Tesla Wall Connector for a homeowner in the Oak Brook subdivision whose 2006 tract home had a builder-grade 100-amp panel that was already maxed. We ran a 60-amp circuit through the attic, upgraded the panel to 200 amps, and set the charger on the garage’s interior side wall so no conduit was visible from the street. The HOA design-review committee never heard about it, and the homeowner gets 44 miles of range per hour.
Pricing for EV Charger Installation in Brushy Creek, TX
Here’s what we charge in Brushy Creek, and the numbers don’t surprise you at the end of the job. A Level 2 charger install on an existing circuit runs $450 to $700 when the panel has capacity and the run is short. A new 240-volt circuit from the panel to the charger location usually runs $850 to $1,600, depending on distance and attic access. A Tesla Wall Connector install with a 60-amp circuit typically falls between $1,200 and $2,000. If you need a 200-amp panel upgrade, that’s $2,800 to $4,200 on top. A driveway-mounted charger with trenching and a post adds $800 to $1,500. Every estimate is free, and we build it off photos and a phone call, not a sit-down sales pitch. Call (877) 550-6892 for an exact number.
We Also Serve Cities Near Brushy Creek
Most of our Brushy Creek work comes from the 78717 ZIP, but we’re in Anderson Mill, Jollyville, Cedar Park, and Wells Branch every week. If you’re just across the Creek, the same pricing and the same crew apply. Read more about our work across the region on our EV Charger Installation in Brushy Creek page, or call and ask for Gus directly.
Serving Brushy Creek, TX - Our Local Coverage Area
We’re based in the Brushy Creek area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Brushy Creek
No, if the charger and all conduit stay inside the garage, your HOA has no say. Texas law (SB 1626 and later HB 362) blocks HOAs from prohibiting solar and EV equipment outright, and a charger on an interior garage wall doesn’t trigger design review. If the charger or conduit is visible from the street, that’s when a design-review request can come into play. We plan installs to keep everything out of sight, so you usually skip the HOA step entirely. Call (877) 550-6892 and we’ll tell you whether your specific setup needs a board sign-off.
It depends on your house’s total electrical load, not just the charger. A 100-amp panel can sometimes handle a 32-amp charger if you have gas appliances and modest AC, but a 2004 Brushy Creek two-story with electric dryer and central air is usually right at the edge. We run a free load calculation before quoting. If the math shows you’ll trip the main breaker, we’ll tell you and give you the panel upgrade number. No scare tactics, just arithmetic. Call (877) 550-6892 and we’ll walk through it.
It can, if you don’t think it through. Your charger will draw power at night when your panels aren’t producing, which means you’ll pull more from the grid and might eat into the credits you banked during the day. But if you schedule charging during peak sun hours, your Enphase system can feed the car directly and your net metering credits stay healthier. We can set your Wall Connector to charge on a schedule that matches your array’s output. Call (877) 550-6892 and we’ll look at your actual usage before we quote.
Yes, but placement and concealment matter. Texas law stops your HOA from banning EV charging equipment outright, but their covenants can still govern where it sits and whether conduit is exposed. We’ve installed driveway chargers in Brushy Creek by running conduit underground and using a low-profile pedestal that doesn’t face the street. If your HOA demands a design review, we’ll help with the paperwork. The key is that “no visible panels” doesn’t mean “no charger.” Call (877) 550-6892 and we’ll talk about your specific covenant language.
Pair the charger with your existing Enphase setup and do the panel work once. If your panel is already near capacity, a load management device can monitor your house’s draw and throttle the charger when the AC kicks on, which often avoids a panel upgrade entirely. For most Brushy Creek homes with Enphase microinverters, the cleanest path is a 60-amp circuit with a load management device, not a full 200-amp panel replacement. We’ll run the numbers and tell you which is cheaper over the life of the home. Call (877) 550-6892 for a free look at your setup.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Brushy Creek and Williamson County since 2011.






Before
After
Before
After
Before
After