Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Bastrop
Most Bastrop EV charger installations take one day, and we can usually be there within 48 hours of your call. We know the difference between a Tahitian Village rebuild with a 200A panel and a 1970s ranch near downtown that still has its original 125A service. That local knowledge means your permit doesn’t stall and your charger actually works the night it’s installed. Call (877) 550-6892 and a live person answers, day or night.
Why Gus’s Solar Is Bastrop’s Preferred EV Charger Installation Company
Gus Petrakis started this company in 2011 and never turned it into a franchise. When you call about EV charger installation in Bastrop, you talk to people who answer their own phone, not a call center in another state. The same crew that quotes the job does the work. The same owner who signs off on the permit is the one you’ll run into at the Bastrop H-E-B.
We’ve wired chargers in homes along Highway 21, through the shaded lots off Tahitian Drive, and in the older grid streets west of the Colorado River. That variety matters. A charger install in a 1982 downtown Bastrop home with a Federal Pacific panel is a different job than one in a 2015 Circle D-KC Estates rebuild. We quote both accurately because we’ve done both, many times.
Austin transplants call us constantly after a national installer quotes them a system sized for Austin Energy rates. We sit down, pull up their actual Bluebonnet bill, and walk through what their solar-paired EV charger will realistically save. No pressure, no signature tonight. Take two weeks. The price will be the same when you call back.
Our Bastrop customers know that a live person answers 24/7. Our techs are background-checked and wear Gus’s Solar uniforms. When something isn’t right, you call and Gus comes back. That’s the 90-Day Done Right Promise, in writing, on every job.
Our EV Charger Installation Services in Bastrop
Level 2 Charger Installation
A Level 2 charger adds roughly 25 to 30 miles of range per hour, which means you wake up full every morning. In Bastrop, where a round trip to Austin and back can eat 60 miles before noon, that daily full charge changes how you use the car. We run the circuit, mount the unit, and verify load capacity before we ever cut drywall.

Tesla Wall Connector Installation
The Tesla Wall Connector is the most common charger we install in Bastrop, especially in the newer subdivisions east of town. It pulls up to 48 amps, which means your panel has to have room for it. On a rebuilt Tahitian Village home with a 200A panel, it’s often a straightforward half-day job. On a 1970s downtown home with a 100A panel, it needs a panel upgrade first. We’ll tell you which one you have before we quote.

Panel Upgrade for EV Charging
Downtown Bastrop homes built before 1990 frequently have 100A or 125A panels. A 48A charger plus a typical Texas AC load leaves no headroom. The load calculation fails, the permit stalls, and you’re stuck. We handle the panel upgrade and the charger install as one job, one permit, one crew. No mid-project surprises.

Garage & Driveway Charger Wiring
Bastrop garages are not all created equal. Some are attached and drywalled. Others are detached, or a carport converted to a garage in the 1980s. We run conduit where it makes sense, THHN sized for the full charger load, and a dedicated breaker. If your charger will sit on an exterior wall, we use weather-rated enclosures and a disconnect within sight of the unit.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Solar-Paired EV Charging in Bastrop: The Part Nobody Explains
Bastrop is served by Bluebonnet Electric Cooperative, not by a municipal utility like Austin Energy. And Bluebonnet is not required by Texas law to offer retail-rate net metering. That means when your solar panels send excess power back to the grid, Bluebonnet credits you at avoided-cost rates, which can be less than half what you pay for power you pull. Read that again, because it changes everything about EV charger installation in Bastrop.
If you’re a transplant from Austin, you might assume your solar array will bank credits during the day that offset your overnight EV charging. It won’t. At avoided-cost rates, the math doesn’t work that way. What actually works in Bastrop is sizing your solar so you charge the car while the sun is up. That might mean a south-facing array, a charger scheduled to pull during peak sun hours, or a battery that captures midday production and feeds the car after dark. If a salesman quotes you a solar-paired charger without mentioning Bluebonnet’s credit structure, he either doesn’t know Bastrop or doesn’t care. Either way, call us instead.
In Tahitian Village, we installed a Tesla Wall Connector for a homeowner whose rebuilt 2013 home already had a modern 200A panel, but the garage faced a dense loblolly pine canopy that cut afternoon solar production by nearly 30% on our azimuth check. We wired the charger through a load-shedding contactor tied to the home’s Enphase microinverters so the EV only pulls from surplus solar, keeping the Bluebonnet true-up from turning into a surprise bill. That’s the difference between an installer who reads a spec sheet and one who actually works in Bastrop.
Our EV Charger Installation team models every Bastrop job off your real Bluebonnet usage, not a brochure estimate. Bring us a bill, we’ll bring you the math.
Trusted Brands We Service in Bastrop
We install and service Tesla Wall Connectors, and we work with Enphase and SolarEdge equipment for solar-paired charging setups. For Bastrop homes adding battery storage to stretch daytime solar into evening charging, we also install FranklinWH systems. We stock common connectors and breakers locally, which means a service call in Bastrop doesn’t wait on a parts truck from Austin. If you already have a charger from another brand, call us anyway. We’ll assess it and tell you straight whether it can be integrated with a solar system or whether you’re better off replacing it.
Common EV Charger Installation Problems We See in Bastrop Homes
- Bluebonnet true-up shock. Homeowners who moved from Austin expect solar credits to cover overnight EV charging at retail rates. Bluebonnet’s avoided-cost credits don’t work that way, and the first true-up statement is a nasty surprise. We walk every Bastrop customer through this before we design anything.
- Oversized chargers on undersized panels. Downtown 1970s and 1980s homes with original 100A or 125A panels fail the load calculation for a 48A Level 2 charger. The permit stalls until a panel upgrade is added mid-project. We catch this in the estimate, not after the drywall is open.
- Shaded charger location. Wooded lots in Tahitian Village and Circle D-KC Estates often put the garage on the one wall a loblolly pine shades all afternoon. That cuts a solar-paired charging window from 5.5 peak sun hours to under 3. We check the azimuth before we mount anything.
- Alley-loaded townhomes without a dedicated garage circuit. Near downtown, some older townhomes share a service or lack a proper garage circuit. Undersized THHN through an inaccessible crawl trips the breaker on every charge cycle. We fix it right the first time, with a real dedicated circuit.
Pricing for EV Charger Installation in Bastrop, TX
A straightforward Level 2 charger installation in Bastrop, where the panel has spare capacity and the charger mounts within 20 feet of the panel, typically runs $450 to $900. That includes the breaker, wire, conduit, labor, and a standard 40A or 48A charger. A Tesla Wall Connector install in a newer Bastrop home with a 200A panel usually lands between $900 and $1,700, depending on the charger version and run length. If your home needs a panel upgrade first, add $2,200 to $4,500 for a 200A service upgrade, which is the most common upgrade for EV charging in Bastrop’s older housing stock.
A solar-paired EV charging package, including the panel integration and any load management hardware, varies more because it depends on your Bluebonnet usage history and whether you add battery storage. A FranklinWH battery added to a solar-paired charger setup typically adds $10,000 to $18,000 before incentives. Estimates are free and the price we quote is the price you pay. No trip charge inside Bastrop zip code 78602. Call (877) 550-6892 for an exact number on your home.
We Also Serve Cities Near Bastrop
We handle EV charger installation throughout Bastrop County and into the neighboring communities, including Camp Swift, Elgin, Manor, and Hornsby Bend. If you’re just outside the Bastrop city limits but still on a Bluebonnet meter, the same rules apply and the same pricing holds. Call us and we’ll tell you straight whether you’re in our service area and how fast we can be there.
Serving Bastrop, TX - Our Local Coverage Area
We’re based in the Bastrop area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Bastrop
Bastrop is served by Bluebonnet Electric Cooperative, which pays avoided-cost credits for excess solar, not the retail-rate buyback Austin Energy offers. That means your solar array won’t build up credits during the day that offset your overnight EV charging at retail value. In Bastrop, the smart play is to charge the car while the sun is actually hitting your panels, or add battery storage to shift that power to the evening. Call (877) 550-6892 and we’ll model it off your real Bluebonnet bill.
In most cases, yes. A 200A panel with spare breaker slots usually accepts a 48A Tesla Wall Connector without a service upgrade. We still check the load calculation and verify the feeder wire size before we quote, but rebuilt Tahitian Village homes rarely need panel work. The bigger variable is shade. If your garage faces a dense loblolly canopy, your solar-paired charging window shrinks, and we’ll flag that during the site visit.
Most homes from that era in Bastrop have 100A or 125A panels, and a 48A Level 2 charger typically pushes the load calculation over the limit. You’ll likely need a 200A panel upgrade before the permit will clear. We bundle the panel swap and the charger install into one permit and one inspection, so you’re not stuck in a three-week limbo between contractors. Call (877) 550-6892 and we’ll tell you what your panel can handle before you commit to anything.
You can absolutely charge when the sun is out without a battery, as long as your schedule lets the car sit plugged in during peak sun hours. That’s the most cost-effective approach under Bluebonnet’s avoided-cost credit structure. A battery makes sense if you charge overnight regularly or want backup power during the outages that Bastrop sees during summer storm season. We’ll show you both options and the year-25 numbers for each.
If your system is solar-paired, the charger location affects when the car pulls power. On a Bastrop lot with a loblolly pine shading the east garage wall, a charger on the west side stays in direct sun longer and maximizes the midday charging window under Bluebonnet’s avoided-cost metering. A contractor who tells you this is thinking about your production, not just the shortest wire run. If you want the charger on the east side anyway, we can do that. We’ll just show you the production difference first, in writing, so there are no surprises.
Call Gus’s Solar for EV Charger Installation in Bastrop
If you live in Bastrop and you’re done with out-of-state call centers and installers who don’t know Bluebonnet from Austin Energy, call us. Gus Petrakis puts his name on every job. The crew is background-checked and uniformed. The price is the price. The 90-Day Done Right Promise is in writing. Call (877) 550-6892 for a free estimate on EV charger installation in Bastrop. A live person answers, 24/7.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Bastrop and surrounding communities since 2011.






Before
After
Before
After
Before
After