Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Allen
Most Allen homeowners call us after they’ve already bought the car. The charger’s still in the box, sitting in the garage next to a 150-amp panel that’s already running two AC units, a pool pump, and an electric oven. Here’s the straight answer: a standard Level 2 charger install inside an Allen garage runs $650-$1,400, and we can usually be there within 48 hours. A panel upgrade, if you need one, adds $2,500-$4,500. Call (877) 550-6892 and we’ll tell you exactly what your house needs before we schedule anything.
Why Gus’s Solar Is Allen’s Preferred EV Charger Installation Company
Gus Petrakis has put his name on the truck for 29 years, and that name means something in Allen. When you call the number, Gus or one of his own crew answers. Not a call center. Not a ticketing portal. A person who knows Allen’s neighborhoods, Allen’s HOAs, and Allen’s electrical inspectors.
We’ve worked in Twin Creeks, Watters Creek, and the older sections west of 75 near Allen High. We know the difference between a 1997 home off Greenville Avenue with original 150-amp service and a 2015 build off Stacy Road that might still need a subpanel for a 48-amp charger. That local knowledge keeps you from paying for work you don’t need, and keeps the inspector from red-tagging the job on final walkthrough.
Every job is done by Gus’s own crew. Background-checked, uniformed, and accountable to one name. No subcontracted labor. No disappearing after the invoice clears. If something isn’t right, the 90-Day Done Right Promise means Gus comes back and makes it right. In writing. On every job.
We serve all of Allen, both zip codes: 75002 east of 75 and 75013 to the west. Same crew, same standards, same phone number.
Our EV Charger Installation Services in Allen
Our EV Charger Installation team handles everything from a simple outlet install to a full service upgrade. Here’s what most Allen homeowners need:
Level 2 Charger Installation
A Level 2 charger on a 50-amp or 60-amp circuit is what most Allen EV owners want. It charges a typical EV overnight instead of the 2-3 days a Level 1 trickle charger takes. In Allen, this usually means running conduit along an interior garage wall, mounting the charger, and landing a new breaker in the panel. If your panel has open slots and enough capacity, this is a half-day job. The Allen market runs $650-$1,150 for a standard install with a customer-supplied charger, or $1,400-$2,200 if we supply the unit.

Tesla Wall Connector Installation
The Tesla Wall Connector draws up to 48 amps continuous when hardwired. That’s a real load, and on many Allen homes built in the 1990s and 2000s, the original 150-amp service doesn’t have the headroom. We check the load calculation before we touch anything. When the panel can handle it, a Tesla Wall Connector install in Allen runs $750-$1,300. When it can’t, we tell you before we start, not after the drywall is open.

Panel Upgrade for EV Charging
Allen’s housing stock is dominated by large two-story brick homes built between the mid-1990s and 2010s. Many still carry the original 150-amp panel, and between the EV, the pool pump, the second AC condenser, and the electric dryer, there’s nothing left. We upgrade Allen panels to 200-amp service regularly. It runs $2,500-$4,000 depending on whether we need to move the meter, touch the service mast, or coordinate with DFW-area inspectors. For a 125-amp subpanel in the garage, budget $900-$1,500.
Garage & Driveway Charger Wiring
Most Allen chargers go inside the garage, on the side wall or the ceiling. But we also handle driveway pedestal installs and exterior conduit runs, and this is where Allen’s specific landscape matters. See, Allen is almost entirely built out as master-planned HOA communities like Twin Creeks and Watters Creek, where Architectural Review Committee approval is required before any visible EV charger wiring or exterior conduit can be installed. Unlike neighboring Plano, which has a much larger share of non-HOA homes where a charger install can often proceed without community design review, Allen homeowners need to think about what the HOA will see before we mount anything outside.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Allen
We work with the brands Allen drivers actually own, including Tesla, Enphase, and FranklinWH. If you’ve already bought a charger from Panasonic, Canadian Solar, or any major brand, we’ll install it. If you haven’t, we’ll be honest about what’s worth buying for your specific panel and your specific driving habits. We stock common breakers, conduit, and mounting hardware locally, which means most Allen jobs don’t wait on a parts order.
Common EV Charger Installation Problems We See in Allen Homes
- Exterior conduit or a pedestal charger in the front driveway setback without ARC approval. This triggers an HOA violation letter, and in some cases the electrical work has to be reversed and redone inside the garage. We’ll tell you before we touch anything.
- A 150-amp panel that can’t carry a 48-amp continuous charger. Very common in Allen homes built before about 2005. The load calculation fails, and the homeowner is left choosing between a slower charge rate and a panel upgrade. We run the numbers before we quote.
- Chargers with bright LED status lights or prominent branding facing the street. Some Allen HOAs have cited this as visual clutter, especially at night. We position chargers so the status light faces into the garage, not out the windows.
- Hail and storm exposure for exterior chargers. Collin County sits in one of the most hail-active corridors in the US. Golf-ball-size hail happens multiple times per decade. An exterior pedestal charger needs a weather-hardened enclosure, and even then, we recommend inside-the-garage installs in Allen whenever feasible.
Pricing for EV Charger Installation in Allen, TX
Here are the numbers for EV Charger Installation in Allen, straight from our current job book:
- Standard Level 2 charger install (customer-supplied unit, panel has capacity): $650-$1,150
- Level 2 charger install with charger supplied: $1,400-$2,200
- Tesla Wall Connector hardwire (no panel upgrade): $750-$1,300
- 125-amp garage subpanel: $900-$1,500
- 200-amp full panel upgrade: $2,500-$4,000
- Exterior pedestal or driveway charger with HOA-required design review: $1,800-$3,500
What moves the price in Allen? Whether your panel has open breaker slots and load capacity, how far the garage is from the panel, whether conduit can run through interior walls or must go exterior, and whether your HOA requires design review for exterior work. Call (877) 550-6892 for an exact quote. Estimates are free. No signature wanted tonight. Take two weeks and think about it. The price will be the same.
We Also Serve Cities Near Allen
Our crews serve Allen and the surrounding communities, including Lucas, Murphy, Fairview, and Plano. If you live just over the city line, the same local knowledge applies. HOA rules, panel ages, and utility rates don’t stop at the Allen sign, and neither do we.
Serving Allen, TX - Our Local Coverage Area
We’re based in the Allen area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Allen
No, an interior garage charger with no exterior conduit, no exterior wall penetration, and no visible wiring from the street typically does not require ARC approval in Allen’s HOA communities. This is why we run conduit along interior garage walls whenever possible. The moment anything becomes visible from the street, approval is required, and that can add 2-6 weeks to your timeline. Call (877) 550-6892 and we’ll tell you whether your specific install triggers review.
Yes, but in Allen’s master-planned communities like Twin Creeks and Watters Creek, you’ll need Architectural Review Committee approval before the work begins. The ARC reviews exterior conduit, pedestal placement, charger appearance, and visibility from the street. We prepare the drawings and handle the submission for you. Budget an extra 2-6 weeks for the review cycle, and plan for the install to fall after approval, not before.
The answer depends on your panel’s current load calculation, not just its age. Many Allen homes built in the 1990s and 2000s have 150-amp panels that are already near capacity. A 48-amp continuous charger needs 60 amps of breaker space and real headroom. If the load calc fails, you need either a slower charge rate or a panel upgrade, which runs $2,500-$4,000 in Allen. We’ll run the calculation before we quote, and we’ll show you the numbers.
Allen residents are served by utilities that offer time-of-use rates and net metering credits for solar production. The practical outcome: charging your EV during off-peak hours or during peak solar production costs significantly less than charging at 6 PM. We set chargers to scheduled charging so you wake up to a full battery at the lowest possible cost. In a Twin Creeks home off Chaparral Road, we installed a Tesla Wall Connector on a 60-amp circuit after adding a 125-amp subpanel in the garage, and scheduled charging to match the utility’s time-of-use window. The homeowner wakes up full every morning.
Yes. The City of Allen requires an electrical permit for any new circuit, subpanel, or charger hardwire install. We pull the permit, schedule the inspection, and stand behind the work. A permit isn’t a hurdle; it’s the paper trail that protects you if something goes wrong. We handle it from start to finish. Call (877) 550-6892 for the specifics on your project.
Call Gus’s Solar for EV Charger Installation in Allen
If you’re tired of chasing quotes and want a number you can trust, bring us your panel photo and your utility bill. Gus will tell you what the job costs, what your panel can handle, and whether you need HOA approval before anything gets mounted. No signature tonight. No pressure. A live person answers the phone 24/7. Call (877) 550-6892 for a free estimate on your Allen EV charger installation.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Allen since 2011.






Before
After
Before
After
Before
After