Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Woodland
A Level 2 EV charger installation in Woodland typically costs $800 to $2,600 depending on whether your panel needs upgrading, how far the wiring run is, and whether you want a solar-paired setup. Most jobs are done in one day by Gus’s own crew, not a sub. We’re local to the valley, we know Woodland’s older wiring and PG&E rates, and we answer the phone at (877) 550-6892 when you call.
Woodland’s not a town where you want some out-of-state call center selling you a charger that doesn’t match your panel or your utility bill. Our EV Charger Installation work here is built around how this city actually lives: old Craftsman panels downtown, 60s ranch tract homes out east, and PG&E’s NEM 3.0 rates that change the whole math of when you should charge.
Key Takeaways:
- Level 2 charger installs in Woodland run $800 to $2,600, with panel upgrades adding $2,000 to $4,500.
- Solar-paired EV charging in PG&E territory can cut your per-mile fueling cost by roughly 75% compared to pulling from the grid at evening peak rates.
- Homes built before 1970 in Woodland often need a service upgrade or load calculation before a charger goes in.
- Gus’s crew does the work directly, 24/7 live phone, and every job is guaranteed in writing.
Why Gus’s Solar Is Woodland’s Preferred EV Charger Installation Company
We’re a locally owned shop that’s been serving northern California since 2011. Gus Petrakis puts his name on the truck, publishes his address and license number, and answers his own phone. When you call about EV charging in Woodland, you’re not getting a call center three states away. You’re getting a real person who knows the difference between a 100-amp panel on College Street and a 200-amp service out near Pioneer Avenue.
Woodland homeowners keep calling us back because we do the work the way a neighbor would: honest numbers, no signature demanded tonight, and a price that’s the same when the job’s done as it was when we quoted it. Our 90-Day Done Right Promise is in writing on every install. If something’s not right, one call brings Gus back. We also offer a senior and veteran 10% discount that never expires, and we won’t charge a trip fee for any job inside our county.
Scheduling and dispatch are coordinated from our Sacramento office, but the crews serving Woodland live and work in the valley. We know the inspectors, the permit office, and the older wiring quirks that trip up out-of-town contractors.
Our EV Charger Installation Services in Woodland
Level 2 Charger Installation
A Level 2 charger adds 25 to 40 miles of range per hour, which means your EV is full by morning. In Woodland, most Level 2 installs involve running a new 240-volt circuit from your panel to the garage or driveway location. The work itself is straightforward, but the older panels we see in town often need a load calculation first. That’s not a upsell. It’s how you avoid tripping your main breaker the first hot afternoon your AC and charger run together.

Tesla Wall Connector Installation
We install Tesla Wall Connectors regularly in Woodland and keep the common hardware on hand, so you’re not waiting a week on a part that could have been in the truck. Tesla’s Wall Connector can deliver up to 44 miles of range per hour on a 60-amp circuit, which usually means a service upgrade for homes still running a 100-amp panel. We’ll tell you straight if your existing panel can handle it. If it can’t, we’ll quote the upgrade with the charger, not as a surprise after the fact.

Panel Upgrade for EV Charging
Woodland has a lot of homes built in the 1960s through the 1980s with 100-amp panels and no spare breaker slots. Adding a 50-amp EV circuit to that panel without an upgrade is asking for trouble. We do full panel replacements to 200 amps, often the same day, and we pull permits and schedule the city inspection. If you’re in the 95695 or 95776 ZIP code and your panel’s original to the house, plan for an upgrade before the charger goes in.

Garage and Driveway Charger Wiring
Detached garages are common in Woodland’s older neighborhoods, and that means trenching or a longer above-ground run. We handle the full path: conduit through the crawlspace, across a short trench, or along the exterior wall. For driveway charging, we position the charger where you actually park, not where it’s easiest to bolt a bracket. We hardwire when it makes sense and install NEMA 14-50 outlets when that fits your setup better.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Woodland
We work with the industry’s leading equipment daily: Tesla Wall Connectors, Enphase EV chargers for homes that already run Enphase inverters, and FranklinWH battery systems when the project calls for solar-paired charging. We carry common Tesla and Enphase hardware in stock, so Woodland installs don’t stall waiting on a freight shipment. If you already have solar from us or another contractor, we’ll spec the charger that plays well with your existing inverter and battery setup rather than pushing whatever’s on the shelf.
Common EV Charger Installation Problems We See in Woodland Homes
- 100-amp panels with no spare slots. The 1960s to 1980s ranch homes scattered through eastern Woodland nearly always have this issue. A charger installed without a load calculation or panel upgrade trips the main breaker when the AC kicks on during a 105-degree summer afternoon. We check panel capacity and breaker availability before we quote anything.
- PG&E NEM 3.0 rates catching solar owners off guard. Woodland sits in PG&E territory, not SMUD. Solar owners who charge their EV straight from the grid in the evening are paying peak rates that wipe out much of the value of their solar system. We fix this by pairing the charger with battery storage so your car charges from stored midday solar instead of PG&E’s evening peak.
- Older downtown homes with outdated service masts and grounding. The Victorians and Craftsman homes near downtown Woodland were built between the 1890s and 1940s. We regularly find service masts, grounding, or panel connections that won’t pass inspection as-is. A charger wired to an old panel without verifying grounding can overheat connections or fail city inspection. We bring the service up to code before the charger goes live.
- Tule fog stretches that kill solar charging for days at a time. From mid-November through February, Woodland’s dense tule fog can cut rooftop solar production by 50 to 70 percent for days straight. If your EV relies on solar without a battery, you’ll be charging from the grid all winter. We design solar-paired installs with a battery buffer specifically for this valley phenomenon.
Pricing for EV Charger Installation in Woodland, CA
A basic Level 2 charger install in Woodland runs $800 to $1,400 when your panel has spare capacity and the charger goes on a garage wall near the panel. A Tesla Wall Connector install ranges $1,200 to $2,600, depending on circuit length and whether we need to trench or run conduit through a crawlspace. A 200-amp panel upgrade adds $2,000 to $4,500. Solar-paired EV charging with a battery system starts around $12,000 before the federal tax credit, which recovers 30 percent. Every quote is built from your actual usage and your actual panel, and we don’t push you to sign anything. Take two weeks, think about it, the price will be the same. Call (877) 550-6892 for a free estimate.
We Also Serve Cities Near Woodland
Our crews regularly serve Davis, West Sacramento, Winters, and Sacramento. If you’re just outside Woodland city limits, call and ask. We’ll tell you straight if we cover your road and what the response time looks like.
Serving Woodland, CA - Our Local Coverage Area
We’re based in the Woodland area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Woodland
Yes, significantly. Woodland is inside PG&E’s service territory, and NEM 3.0 took effect in April 2023. Your solar export compensation dropped by roughly 75 percent compared to what Sacramento SMUD customers receive. That means selling your extra solar back to the grid in the afternoon earns you little, while pulling grid power to charge your EV at PG&E’s evening peak rates erases much of what your solar should be saving you. The fix in Woodland is to pair your EV charger with a battery so your car charges from stored solar during the evening instead of from PG&E’s grid. Charging from a battery that stores midday solar costs roughly 25 percent of what it costs to pull from PG&E at evening peak. Call (877) 550-6892 and Gus will run your real numbers off your actual bill.
Yes, the tule fog is Woodland’s biggest solar variable. Dense radiation fog blankets the valley floor from roughly mid-November through February, and during peak fog events rooftop production can drop 50 to 70 percent for days at a time. If your EV charger is wired to pull from the grid whenever your solar isn’t producing, you will be paying PG&E’s retail rates for all your winter charging. The workaround is a battery that charges during those rare clear winter afternoons and carries your EV charging through the foggy stretches. If you already have solar in Woodland and no battery, this is the first thing we fix before adding an EV charger. Call (877) 550-6892 for an honest assessment.
Usually yes, but it depends on your service. Many of the Victorian and Craftsman homes near downtown Woodland still have 100-amp panels, aging service masts, and sometimes remnants of knob-and-tube wiring. Before a Level 2 charger can safely go in, we verify the panel capacity, grounding, and service conductors. In many cases you need a panel upgrade to 200 amps, and occasionally the service mast itself needs replacing. We’ve done exactly this on Elliot Street, where we upgraded a 1940s Craftsman to a 200-amp panel, ran 6 AWG THHN through the crawlspace to a new 50-amp circuit, and wired a Tesla Wall Connector in a detached garage. It passed city inspection the first time. Call (877) 550-6892 and we’ll tell you what your specific house needs.
The Tesla Wall Connector pulls up to 48 amps on a 60-amp circuit, which adds up to 44 miles of range per hour. Most generic Level 2 chargers top out around 32 to 40 amps on a 50-amp circuit. In practical terms for Woodland drivers, the Tesla unit charges faster and often requires a panel upgrade, while many generic units can fit on existing 200-amp service without major changes. If you drive a non-Tesla EV, a generic Level 2 charger or an Enphase unit may make more sense. We won’t sell you a brand for the sake of the brand. We’ll match the charger to your panel, your car, and your daily mileage. Call (877) 550-6892 and Gus will give you the straight comparison.
Sometimes, but not always. Many Woodland solar installs from the past decade were added to a 100-amp or 125-amp panel that already had no spare breaker slots. If your solar was installed with a main panel upgrade to 200 amps, you likely have room for a 50-amp EV circuit. If your solar was squeezed onto an existing panel with a line-side tap, adding an EV charger usually means a panel upgrade. We’ll run a load calculation before we quote anything, so you’re not guessing. The calculation takes about an hour, and we don’t charge for the assessment when you’re serious about the install. Call (877) 550-6892 to schedule one.
Call Gus’s Solar for EV Charger Installation in Woodland
We’ve been doing this long enough that we don’t need to rush you. Get an honest quote, take two weeks to think about it, and the price will be the same. Bring us a bill, we’ll bring you the math. If a salesman needs an answer tonight, the answer is no, and we’re not that company. Call (877) 550-6892 and a live person will answer, 24/7. We serve all of Woodland, including the 95695 and 95776 ZIP codes, from the historic downtown neighborhoods to the east-side ranch tracts. Every job comes with our 90-Day Done Right Promise in writing. If it’s not right, Gus makes it right.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Woodland since 2011.






Before
After
Before
After
Before
After