Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Temple City
Most Temple City homeowners we talk to want one thing: a charger on the wall that works every morning, installed in a single visit by someone who actually knows 91780 homes. That’s what our EV Charger Installation team delivers. We know the ranch houses off Las Tunas Drive, the bungalows near Temple City Park, and the detached garages down long driveways where the main panel sits 100 feet or more from where your car sleeps. Call (877) 550-6892 and Gus’s own crew will be there, usually within a day or two.
Here’s the short version: a Level 2 charger install in Temple City typically runs $800 to $2,400 depending on your panel, run distance, and whether you want a simple NEMA 14-50 outlet or a hardwired Tesla Wall Connector. Panel upgrades, when needed, add $2,500 to $5,500. We quote the real number up front, off your actual panel and run distance, not a brochure figure.
Why Gus’s Solar Is Temple City’s Preferred EV Charger Installation Company
Gus Petrakis founded this company in 2011 and he still puts his own name on the truck. That matters in Temple City, where a lot of the homes carry quirks only a local crew recognizes. The 1960s ranch with a Zinsco subpanel feeding the garage. The 1970s bungalow where someone added a second kitchen and never upgraded the service. The tile roof where penetrating hardware has to be right the first time or you’re replacing tiles in the rainy season.
Our EV Charger Installation in Temple City customers tend to be homeowners who have lived here a long time. They ask direct questions and expect direct answers. That’s how we work. A live person answers the phone 24/7, not a voicemail or a call center three states away. You’ll talk to someone who knows what a load calculation is and why SCE’s time-of-use rates change the math on when you should schedule charging.
We’re not a pop-up sales crew. Gus’s Solar has a published address, a license number, and an owner whose name is on the building. Background-checked, uniformed technicians do the work. Gus’s own crew, not a subcontractor. And every job carries the 90-Day Done Right Promise in writing. If it’s not done right, one call brings Gus back.
Our EV Charger Installation Services in Temple City
Level 2 Charger Installation
A Level 2 charger adds roughly 25 to 30 miles of range per hour, which covers just about any Temple City commute plus weekend trips across the San Gabriel Valley. Most homes here get a NEMA 14-50 outlet or a hardwired unit on a 50-amp circuit. Before we quote, we confirm your panel can actually deliver that. A lot of Temple City homes can’t, and we’ll tell you before we send a crew.

Tesla Wall Connector Installation
We install and service Tesla Wall Connectors throughout 91780. The unit wants a 60-amp breaker to hit its full 48-amp charge rate, and that’s where Temple City’s older panels often fall short. We recently wired a Tesla Wall Connector in the foothills off Las Tunas Drive, where the homeowner’s 1960s ranch still had a Zinsco subpanel feeding a detached garage. Our crew pulled a permit that morning, replaced the subpanel with a 125-amp rated unit, and ran 6/3 Romex through the existing service conduit to the garage wall, finishing before the afternoon smog rolled in and leaving the charger’s Wi-Fi connected for SCE time-of-use scheduling.

Panel Upgrade for EV Charging
This is the conversation we have most often in Temple City. Homes built between the 1940s and 1970s frequently carry original 60- or 100-amp Federal Pacific or Zinsco panels, even when the kitchen has been fully renovated and the roof replaced. A charger pulling 48 amps will trip those breakers or, worse, overheat wiring that was never rated for continuous load. If you live in the neighborhoods around Cloverly Avenue or Longden, plan on us checking the panel before anything else. A 200-amp panel upgrade runs $3,000 to $5,500 in Temple City depending on whether SCE needs a service lateral replacement from the pole.

Garage & Driveway Charger Wiring
Detached garages and workshops are common in Temple City’s acreage and semi-rural pockets, especially south of Las Tunas and along the Eucalyptus-lined streets near Live Oak Park. A 150-foot run from the main panel to a detached garage needs heavier-gauge conductors and conduit than a 30-foot run inside an attached garage. We account for voltage drop on long runs, and we’ll tell you if the extra copper is worth it versus mounting the charger on a pedestal closer to the panel. No surprises at the end.

Solar-Paired EV Charging
This is where Temple City’s electrical reality gets interesting. The entire city sits inside Southern California Edison territory, and NEM 3.0 export rates are so low that daytime solar production exported to the grid earns almost nothing. A Level 2 charger wired through a solar-plus-battery system changes that math. Instead of exporting midday production for pennies, you store it in a battery like a FranklinWH or Tesla Powerwall and dump it into your car at night when you’d otherwise pay peak SCE rates. We’ll quote the year-25 output from your actual usage, not the day-one brochure number.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Temple City
We work with the equipment Temple City homeowners actually have and want: Tesla Wall Connectors, Enphase microinverters, SolarEdge inverters, FranklinWH batteries, and panels from Qcells, REC, and Panasonic. If you already have solar from a previous installer and want to add a charger, we’ll check your inverter capacity, confirm whether your microinverters need a firmware update before pulling more from the busbar, and make sure the interconnection agreement with SCE still covers the added load. We stock common breakers, disconnects, and mounting hardware locally, so turnaround in Temple City is usually days, not weeks.
Common EV Charger Installation Problems We See in Temple City Homes
- Hidden Zinsco or Federal Pacific panels. Installers pulling permits at Temple City’s building department regularly discover that homes with fully renovated kitchens and new tile roofs still hide original 60- or 100-amp Federal Pacific or Zinsco panels in the garage. These panels fail load calculations and are known fire hazards under continuous load. You need this scoped and priced before the site visit ends, not discovered after the permit is pulled.
- Long service drives to detached garages. Temples City’s rural and acreage properties often need 100- to 150-foot wire runs to a detached workshop or garage. That’s not the same job as a 20-foot run in an attached garage. Heavier-gauge conductors, conduit, and trenching all add cost, and a generic installer from a coastal market will often underbid it and then ask for more money mid-job.
- Tile roof penetrations done wrong. A large share of Temple City’s post-war ranch homes have been renovated with concrete or clay tile roofs. Charger wiring that passes through a tile roof requires specialized mounting hardware and flashing. Done wrong, you’re replacing tiles after the first winter storm. We flash every penetration properly, the same standard we hold on every solar roof job.
- SCE rate confusion on solar-paired chargers. If the current transformer isn’t configured for bidirectional export on a solar-paired setup, your true-up statement will show zero credits for daytime charging. We confirm with SCE whether your home is on a time-of-use or net metering rate before we wire anything, so the payback math is real, not hypothetical.
Pricing for EV Charger Installation in Temple City, CA
Here are the numbers we quote when Temple City homeowners call:
- NEMA 14-50 outlet install (short run, attached garage): $800-$1,400
- Hardwired Level 2 charger (50-amp circuit, attached garage): $1,200-$1,800
- Tesla Wall Connector install (60-amp circuit, hardwired): $1,400-$2,200
- Detached garage or workshop run (100-150 feet, with conduit): $1,800-$2,600
- Panel upgrade to 200 amps (main panel replacement): $3,000-$5,500
- Solar-paired EV charging (charger plus battery integration): $4,000-$8,000 depending on battery size
What moves the number: panel age and brand, wire run distance, whether you need conduit above ground or trenching below, and whether SCE requires a service lateral upgrade from the pole. We quote the real number before we start. Free estimates on every job. Call (877) 550-6892 and bring us a photo of your panel. We’ll give you the math.
We Also Serve Cities Near Temple City
Gus’s Solar handles EV charger installation in Rosemead, San Gabriel, Arcadia, and East San Gabriel. Crews are scheduled from our Los Angeles office and serve Temple City locally, so response time stays tight across the San Gabriel Valley. If you’re one ZIP code over, the same crew and the same upfront pricing apply.
Serving Temple City, CA - Our Local Coverage Area
We’re based in the Temple City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Temple City
Yes. Temple City building permits for EV chargers require a load calculation showing your panel can handle the additional continuous load. A 48-amp charger on a 100-amp panel almost never passes, especially in older ranch homes with electric dryers, air conditioning, and updated kitchens. Call (877) 550-6892 and we’ll run the calculation before you pay for a permit.
You can if the mounting penetrations are flashed correctly using hardware rated for the specific tile type. Many Temple City homes have concrete or clay tile roofs installed in the last 15 to 25 years, and a sloppy penetration will void the tile manufacturer’s warranty the first time it rains. We use tile-specific mounting brackets and flashing on every roof and wall penetration. Call (877) 550-6892 to schedule a roof assessment.
NEM 3.0 cut SCE’s export credit rates by roughly 75%, which means daytime solar sent to the grid earns almost nothing. Pairing your charger with battery storage lets you capture that daytime production and use it at night when SCE’s time-of-use rates peak. In Temple City, where the entire city sits in SCE territory, this is often the difference between a 9-year and a 14-year payback on the same roof. Get a quote built off your actual bill by calling (877) 550-6892.
Sometimes yes. Enphase microinverters on the same busbar as an EV charger may need a firmware update and a grid profile adjustment to maintain compliance with SCE’s interconnection rules, especially if the charger is added to a solar-plus-storage system. It’s a software fix we handle during the install, but it needs to be identified before the charger goes live. Call (877) 550-6892 and we’ll check your Enphase system remotely before scheduling.
For a 150-foot run carrying 48 amps continuous, you need at least 6 AWG copper for a short run, but at that distance 4 AWG or heavier is often required to keep voltage drop under 3%. The exact gauge depends on your panel’s available capacity and whether you’re running through conduit or direct-burial cable. Our crew sizes it properly during the site visit, and the quote includes the right conductor, not the cheapest one. Call (877) 550-6892 for a free assessment.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Temple City with EV charger installation and solar services since 2011.






Before
After
Before
After
Before
After