Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Sherman Oaks
A Level 2 EV charger installation in Sherman Oaks typically runs between $900 and $2,800, and most jobs are completed in a single day when your panel can handle the extra load. If you live in a 1950s ranch home north of Ventura Blvd still running a 100A panel, you’ll likely need a panel upgrade first, which adds $2,500 to $4,500 to the total. We know Sherman Oaks homes, we know LADWP’s paperwork, and we answer the phone when you call: (877) 550-6892.
Gus Petrakis started Gus’s Solar in 2011 with a simple rule: put your name on the truck and stand behind the work. That’s how we’ve operated in Sherman Oaks for years. Whether you’re off Sepulveda near the 101 or up in the hills south of Ventura Blvd, we send background-checked, uniformed crews who know the difference between a 1960s ranch panel and a newer 200A service. No subcontractors. No call centers. Just our own people, on time, doing the job right.
Why Gus’s Solar Is Sherman Oaks’s Preferred EV Charger Installation Company
Sherman Oaks homeowners call us because we treat their house like it’s our house. We quote real numbers off your actual utility bill and your panel’s actual capacity, not a brochure estimate from an out-of-state sales deck. Bring us a bill, we’ll bring you the math. And take two weeks to think about it. The price will be the same. If a salesman needs an answer tonight, the answer is no.
Our L.O.C.A.L. values govern every job: Local roots, On time, Community first, Accountable, Loyal. That means a live person answers the phone 24/7, even on a Sunday night when your charger won’t start. It means Gus’s own crew does the install, not a sub we’ve never met. It means the 90-Day Done Right Promise is in writing on every job: if it’s not right, we make it right. One call brings Gus back.
We’ve worked on Sherman Oaks homes from the flat, post-WWII ranch tracts north of the Boulevard to the hillside custom builds climbing toward Mulholland. That range of experience matters. A charger install on a 1958 ranch with knob-and-tube remnants is a different job than a modern hillside home with a 400A service and a three-car garage. We’ve done both, many times.
Our EV Charger Installation Services in Sherman Oaks
Every EV charger job starts with a look at your panel, your driving habits, and your garage layout. From there, we recommend the right charger and the right circuit. Here’s what we install most often in Sherman Oaks:
Level 2 Charger Installation
A Level 2 charger delivers 240 volts and typically adds 25 to 40 miles of range per hour. For most Sherman Oaks homes, that means a 40A or 50A circuit on a dedicated breaker. We handle the full install: permit, wiring, breaker, charger mounting, and startup test. On homes south of Ventura Blvd where garages sit at street level or below the house, we often run surface conduit to keep the job clean without tearing into finished walls.

Tesla Wall Connector Installation
We install a lot of Tesla Wall Connectors in Sherman Oaks. The current generation supports up to 48A charging on a 60A circuit, but the right setting depends on your panel’s headroom. On a hillside home south of Ventura Blvd near Mulholland, our crew installed a Wall Connector with a 60A circuit after upgrading the original 1950s-era 100A panel to 200A. We ran conduit along the irregular roofline and configured load management so the charger pulls only excess solar production. The homeowner’s true-up statement dropped by over a third.

Panel Upgrade for EV Charging
This is the biggest piece of the picture for Sherman Oaks ranch homes built in the 1950s and 60s. Many still run original 100A or 125A panels. Add a 48A EV charger to that while the AC runs full blast on a 100°F Valley afternoon, and the main breaker trips. We see it constantly. A panel upgrade to 200A typically runs $2,500 to $4,500 in Sherman Oaks, and it’s not optional if you want to charge at full speed while the rest of the house runs normally. We pull permits through LADBS and handle the whole job with our own crew.

Garage & Driveway Charger Wiring
Not every Sherman Oaks garage has a clean path from the panel to the charger location. Detached garages, converted garages, and driveway-mounted pedestals all need different approaches. We run conduit neatly, match paint where we can, and leave the space cleaner than we found it. On 91403 homes where the panel sits on the opposite side of the house from the garage, we’ll give you an honest price for the longer run before we start, not after.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Sherman Oaks
We install and service chargers from the brands Sherman Oaks homeowners already trust: Tesla, Enphase, SolarEdge, Juuce, ChargePoint, and Wallbox. When your charger pairs with a solar system, the integration questions matter. We work with Qcells and Enphase equipment regularly, so a solar-paired EV charger is a designed system, not a bolt-on. For panel upgrades and repiping, we stock common breakers and components locally, which keeps turnaround fast when your charger goes down in the middle of the week.
Common EV Charger Installation Problems We See in Sherman Oaks Homes
These are the failure modes we run into most often, specific to Sherman Oaks’s housing stock and climate:
- 1950s ranch panels can’t handle the load. North of Ventura Blvd, homes built in the 50s and 60s often still run 100A panels. A Level 2 charger pulling 40-60A on top of AC, pool pumps, and the rest trips the main breaker on hot Valley afternoons. The fix is a panel upgrade, not a smaller charger.
- Inverter placement in direct Valley sun. San Fernando Valley summer heat pushes rooftop and wall temperatures past 90°F, and an inverter mounted on a south-facing wall or under an unshaded eave will throttle charging speed. We place inverters on shaded north walls or inside the garage, where the heat profile stays manageable.
- LADWP interconnection stalls on solar-paired chargers. Out-of-area contractors used to SCE’s fast online portal often miss the 8-14 week LADWP approval backlog. The charger gets installed but sits disconnected while the paperwork grinds through. We pad our timelines for LADWP from day one and tell you exactly when to expect go-live.
- Irregular hillside rooflines complicate conduit runs. South of Ventura Blvd toward Mulholland, steep and irregular rooflines make clean conduit runs harder. Amateurs leave surface conduit snaking across fascia boards and patio walls. We plan routes that follow existing lines and keep the install looking intentional.
Pricing for EV Charger Installation in Sherman Oaks, CA
Here’s what you’ll pay in Sherman Oaks, honestly:
- Level 2 charger install, panel has capacity: $900 - $1,800
- Tesla Wall Connector install, panel has capacity: $1,200 - $2,200
- Panel upgrade to 200A (required on many 1950s-60s ranch homes): $2,500 - $4,500
- Solar-paired EV charger with load management: $2,800 - $5,500 including charger, wiring, and integration
- Driveway pedestal or detached garage run (long conduit path): $1,500 - $3,000
What moves the number: your panel’s current capacity, the distance from panel to charger, whether you need LADWP interconnection, and whether you want solar integration. We don’t quote over the phone without seeing your panel, but we’ll give you a free on-site estimate and the number we quote is the number you pay. Call (877) 550-6892 for a free estimate. No signature wanted tonight. Take two weeks and think about it.
We Also Serve Cities Near Sherman Oaks
Our crews cover Sherman Oaks and the surrounding Valley communities, including Sherman Oaks neighbors in Valley Glen, Van Nuys, Studio City, and Encino. If you’re just over the line in any of those cities, the same team, the same pricing, and the same 90-Day Done Right Promise apply. Our EV Charger Installation team handles jobs across the entire 91403, 91413, 91423, and 91495 area.
Serving Sherman Oaks, CA - Our Local Coverage Area
We’re based in the Sherman Oaks area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Sherman Oaks
Yes, in most cases. Ranch homes that age were built with 100A or 125A panels, and that’s not enough headroom for a 40-60A EV charger on top of modern AC loads. If your panel is original, plan on a 200A upgrade alongside the charger install. Call (877) 550-6892 and we’ll check your panel before quoting anything.
Every solar-paired EV charger in Sherman Oaks must pass through LADWP’s interconnection queue, which currently runs 8-14 weeks behind. That’s not a guess; that’s the documented backlog. We build that timeline into your project from the start, so you’re not surprised when the charger is installed but the solar integration approval takes another two months. Estimates are free, and the timeline comes with a written schedule.
On a shaded north wall or inside the garage, never on a south-facing exterior wall or under an unshaded eave. Sherman Oaks’s Valley heat regularly pushes wall temperatures past 90°F, and thermal throttling means slower charging speeds. We handle placement on every install because getting this wrong costs you range every single hot afternoon.
It can reduce it substantially, but “eliminate” depends on your system size, your driving habits, and LADWP’s current net metering rates. On the hillside home near Mulholland where we installed a Tesla Wall Connector with load management, the homeowner’s true-up dropped by over a third. Bring us a bill, we’ll bring you the math on what your specific setup will do. Call (877) 550-6892.
Yes. The charger itself mounts in the garage or on a wall, not the roof. The challenge is a clean conduit run from the panel, which on hillside homes often sits far from the garage or at a different elevation. We run conduit carefully along existing lines and place the inverter on a shaded wall, exactly as we did on a recent job south of Ventura Blvd near Mulholland where the roofline was anything but straight.
Call Gus’s Solar for EV Charger Installation in Sherman Oaks
You’ll talk to a live person, every time, 24/7. You’ll get a real quote based on your actual panel and your actual bill. And you’ll get a written 90-Day Done Right Promise on every job. If it’s not right, Gus makes it right. Call (877) 550-6892 today for a free EV charger installation estimate in Sherman Oaks. Take two weeks to think about it. The price will be the same.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Sherman Oaks since 2011.






Before
After
Before
After
Before
After