Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Pasadena
Most EV charger installations in Pasadena take one day from arrival to a finished, inspected circuit, and the total cost typically lands between $900 and $2,800 depending on your panel, your garage layout, and whether Pasadena Water and Power requires a service upgrade first. That’s the honest range, not a teaser number. We’re Gus’s Solar, and we’ve been handling EV charger work in Pasadena long enough to know that the utility here, PWP, runs its own permitting queue and its own EV rate schedules, which changes what “fast” means and what your charger will actually cost to run. If you’re ready to stop guessing, call us at (877) 550-6892 and we’ll give you a straight answer, not a brochure number.
Why Gus’s Solar Is Pasadena’s Preferred EV Charger Installation Company
Gus Petrakis put his name on this company in 2011, and he still answers his own phone. That matters in Pasadena, where homeowners have been burned by out-of-state sales crews that quote one price over the phone and another one at the door. When you call us, a live person picks up, 24 hours a day. When we come to your home in Pasadena, the crew is background-checked, uniformed, and employed by Gus directly. We don’t hand work to a sub, and we don’t disappear after the permit closes.
Our reputation here is built on the 90-Day Done Right Promise. Every EV charger job is guaranteed in writing. If the conduit is crooked, the breaker buzzes, or the charger faults under load, one call brings us back. In Pasadena, where so much of the housing stock predates World War II, that guarantee gets used more than you’d think. Old panels, old sheathing, old service entrances. We’ve seen it all in the Bungalow Heaven district and we’re still standing by the work.
We’re also one of the only local teams that actually understands PWP’s interconnection process. Most installers quote an SCE-style timeline. In Pasadena, that’s a recipe for a missed in-service date. We don’t quote SCE timelines. We quote PWP timelines, because that’s the utility that actually signs off on your charger.
Our EV Charger Installation Services in Pasadena
We handle the full range of EV charger work across Pasadena, from 91103 up through 91107 and every ZIP in between. Here’s what most Pasadena homeowners call us for.
Level 2 Charger Installation
A Level 2 charger is the standard for home charging in Pasadena. It runs on a 240-volt circuit and refills most EVs overnight, every night. In Pasadena, a typical Level 2 install runs $900 to $1,600 when your existing panel has capacity and the run from panel to garage is under 50 feet. Longer runs, detached garages, or a panel that’s already maxed out push that number up. Most Pasadena homes we service have panels that were sized for a 1950s electrical load, not a 48-amp continuous draw, so we always start with a panel load calculation before we quote a circuit.

Tesla Wall Connector Installation
The Tesla Wall Connector is the most common charger we install in Pasadena, and for good reason. It’s simple, it’s durable, and it integrates cleanly with Tesla’s app. A Wall Connector install in Pasadena typically runs $1,100 to $1,800, depending on whether you want the hardwired 48-amp version or the plug-in variant. We stock the unit, the breaker, and the conduit locally, so we don’t order parts and hope they arrive. On a recent job in the Bungalow Heaven district, we ran 150 feet of 6/3 copper from a 200-amp service to a detached garage, and the customer was charging by dinner.

Panel Upgrade for EV Charging
This is the one that catches Pasadena homeowners off guard. Many of the homes in 91103 and 91104, the Craftsman-heavy neighborhoods, still have original 60-amp or 100-amp service entrances. A 48-amp EV charger needs a dedicated 60-amp breaker. That math does not work on a 60-amp panel. In Pasadena, a 200-amp service upgrade and all the associated PWP paperwork typically runs $2,500 to $4,000, before the charger circuit itself. We do not quote an EV charger on a panel that won’t carry it, because that’s how you get a dangerous install and a failed inspection. We check the panel first, then we quote the real number.

Garage & Driveway Charger Wiring
Detached garages are common in Pasadena, especially in the pre-war neighborhoods. That means trenching conduit, pulling wire through old framing, and sometimes drilling through 90-year-old stucco. A garage run in Pasadena typically adds $400 to $1,200 to the install, depending on distance and whether we’re trenching across a yard or running conduit along a wall. We schedule the trenching and the electrical work in one visit, so you don’t have a ditch open for three weeks waiting on a second crew.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Pasadena
We work with the equipment Pasadena homeowners actually ask for. Tesla Wall Connectors, Enphase EV chargers, SolarEdge inverters, and FranklinWH battery systems all cross our workbenches regularly. When a brand updates firmware or changes wiring requirements, we know before the part arrives. That’s the difference between an install that passes PWP inspection on the first try and one that gets red-tagged for a grounding detail. We stock the common parts in our truck for every Pasadena call, so a missing conduit fitting doesn’t cost you an afternoon.
Common EV Charger Installation Problems We See in Pasadena Homes
- An SCE-timeline quote. An installer who does most of their work in Monrovia or Arcadia quotes you a two-week interconnection window. PWP runs its own queue, and in busy months that queue stretches to six or eight weeks. We quote PWP’s actual calendar, not an SCE estimate, so your in-service date is real.
- A 1940s panel asked to do 1990s work. Plenty of Pasadena bungalows still have 60-amp or 100-amp service. A 48-amp charger needs a dedicated 60-amp breaker. The math doesn’t work, and we won’t pretend it does. We flag the panel issue on the first visit, before you’ve spent money on a charger you can’t power.
- A charger mounted on an unbraced garage door header. In the canyon-facing neighborhoods of Pasadena, Santa Ana winds push against detached garage doors season after season. A charger bolted to a header that’s already flexing will work loose at the connection point. We check the header, brace it where needed, and mount the charger to framing that won’t move.
- Solar and EV circuits on the wrong side of the meter. If you already have a PWP net metering agreement, your new EV circuit has to be separated from the solar production meter. An installer who doesn’t know PWP’s rules will tie the charger into the wrong location, and your inspection will fail. We’ve unwound more than one of these, always on a quote from someone who doesn’t work Pasadena regularly.
Pricing for EV Charger Installation in Pasadena, CA
Here are honest Pasadena numbers. A straightforward Level 2 charger install with an existing panel that can handle it comes in around $900 to $1,600. A Tesla Wall Connector on a similar setup runs $1,100 to $1,800. Add a detached garage run and you’re looking at another $400 to $1,200 in conduit and trenching. If your home needs a 200-amp service upgrade first, budget $2,500 to $4,000 before the charger itself. PWP’s EV-only time-of-use rate schedule matters here too. A charger sized and permitted for SCE territory may cost more to operate under PWP’s rate structure, especially if you’re charging during peak windows. We can show you the math off your actual PWP bill, not a generic estimate. Call (877) 550-6892 and we’ll walk you through it. Estimates are free, and nobody will ask you to sign tonight.
We Also Serve Cities Near Pasadena
In addition to our EV Charger Installation work across Pasadena, we regularly serve South Pasadena, San Marino, Altadena, and East Pasadena. If you’re in one of those communities, the same crew, the same pricing, and the same done-right promise apply. And if you’re deeper into the San Gabriel Valley, check out our EV Charger Installation in Pasadena page for the full service-area breakdown.
Serving Pasadena, CA - Our Local Coverage Area
We’re based in the Pasadena area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Pasadena
Yes. Pasadena Water and Power is a city-owned municipal utility, not an SCE service territory, so every EV charger install in Pasadena requires a PWP electrical permit and a PWP inspection before you can legally energize the circuit. The application process is different from what SCE-based installers are used to, and PWP runs its own queue. We file the paperwork, schedule the inspection, and don’t quote an in-service date until PWP confirms their inspection window. Call (877) 550-6892 and we’ll tell you exactly where your address sits in the current queue.
Almost never. A 48-amp charger needs a dedicated 60-amp breaker, and most 1930s bungalows in Pasadena, especially in Bungalow Heaven and the 91104 ZIP, still carry 60-amp or 100-amp service entrances. That leaves zero room for an EV circuit. We’ll do a load calculation on your existing panel, and if an upgrade is needed, we’ll quote the real 200-amp service figure before you buy a charger.
PWP’s net metering agreement requires your EV charger circuit to be separated from your solar production meter, which means the charger can’t be tied into the same location as your PV output. An installer who doesn’t know PWP’s rules will land the circuit on the wrong side of the meter and you’ll fail inspection. If you have an existing solar array and you’re adding a charger in Pasadena, we’ve handled this exact setup many times. Call us for the specifics of your panel and meter configuration.
Yes, with conditions. The Bungalow Heaven district is a nationally recognized historic district, and Pasadena’s Design Review Board can require approval for visible exterior changes to contributing structures. A wall-mounted charger on the exterior of a home, or on a detached garage visible from the street, may need Design Review approval before PWP will issue the permit. Interior installations, or chargers mounted inside a garage, generally do not. We’ve done both in 91104, and we’ll tell you which category your home falls into before you spend a dollar.
No. Rapid shutdown requirements apply to solar PV circuits and DC conductors, not to your 240-volt AC EV charging circuit. The two systems are separate, but the interconnection rules in Pasadena require that they both be accounted for on your PWP paperwork. If your solar array is older, we’ll verify that the rapid shutdown system is code-current at the same time we pull your EV permit. It’s a common catch on older Pasadena solar installs, and PWP inspectors will flag it.
If you’re in Pasadena and you want an EV charger installed right, call Gus’s Solar at (877) 550-6892. We’ll give you a free estimate, a real PWP-based timeline, and a number that won’t change when the crew shows up. Take two weeks to think about it. The price will be the same.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Pasadena and the San Gabriel Valley.






Before
After
Before
After
Before
After