Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across North Hills
EV charger installation in North Hills runs $1,450-$4,800 for most homes, with the biggest variable being whether your electrical panel needs an upgrade first. We’re in and out in one to two days on a standard Level 2 install, and longer when LADWP permitting or panel replacement is involved. If you live in 91343 or 91393 and you’re tired of trickle-charging off a wall outlet, call (877) 550-6892 and we’ll give you real numbers before we ever step foot on your property. Gus Petrakis answers his own phone, and he’ll tell you straight what your house needs.
Why Gus’s Solar Is North Hills’s Preferred EV Charger Installation Company
Most North Hills homes were built between the late 1940s and the mid-1970s. That means ranch-style tract houses, 100-amp service panels, and wiring that predates the idea of an electric car in every driveway. Gus’s crew has been through enough of these garages on Chase Street, Parthenia Place, and Nordhoff Street to know what we’re going to find before we open the panel cover. We quote the full job up front, not a teaser number that balloons after a site visit.
When you call, a live person answers. Not a call center in another state. If your charger stops working at 9 p.m., you’ll reach someone who knows your name and your street in North Hills. We stock the common parts locally, so we’re not waiting on a warehouse in Phoenix to ship a breaker. And because we’ve been doing this since 2011, we’ve seen what LADWP inspectors flag and what they pass, which saves you from a surprise re-inspection.
Our customers in North Hills keep us around because we show up when we say we will. A background-checked, uniformed crew does every job. No subs, no hand-offs. Gus’s name is on the truck and the invoice.
Our EV Charger Installation Services in North Hills
Level 2 Charger Installation
A Level 2 charger is the practical choice for North Hills drivers. It fills a 60 kWh battery overnight instead of taking two days on a standard 120V outlet. We handle the circuit, the mounting, the charger, and the LADWP paperwork. Typical cost in North Hills runs $1,450-$2,200 on a panel with available capacity. On an older home with a full panel, price moves toward the higher end once we add a subpanel or service upgrade.

Tesla Wall Connector Installation
We install Tesla Wall Connectors on a regular basis across 91343. The unit itself is capable of 48 amps, which is exactly where a 100-amp panel starts to strain. On a North Hills ranch with central A/C and a 100-amp service, we often recommend load management or a panel upgrade so your car charges at the safest rate the house can actually support. We quote the Tesla job with the same honesty: if your panel won’t tolerate 48 amps, we’ll tell you before you buy the connector.

Panel Upgrade for EV Charging
This is the service North Hills calls us for more than any other. If your house still runs on an original Federal Pacific Stab-Lok or Zinsco panel from the 1960s or early 70s, LADWP will not approve an EV charger attached to it. Period. Gus’s crew quotes a panel replacement as a line item on nearly every pre-1980 home in North Hills before we even do the first site visit. A 200-amp panel upgrade in North Hills typically runs $3,200-$4,800, including permit and utility coordination.

Garage & Driveway Charger Wiring
Most North Hills ranch homes have detached or attached garages at the back of the driveway, which means a longer circuit run than a new build. We run conduit along the beam or trench to a driveway pedestal when the garage is too tight. We also re-pull old cloth-insulated feeders when we find them, because continuous EV load through 1960s cloth wiring is a fire risk, not a hypothetical. The cost depends on the run distance and the panel work, but we show you the per-foot number before we start.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in North Hills
We work with the major charger brands North Hills homeowners actually buy: Tesla, Enphase, and FranklinWH equipment for solar-paired charging, plus the standard Level 2 units from ChargePoint and JuiceBox when you already own one. We don’t push you toward a brand we make margin on. If you bring us a Panasonic or Canadian Solar quote for the solar side of things, we’ll look at it honestly. We stock common breakers, disconnects, and mounting hardware locally so a standard Level 2 job doesn’t stall waiting on parts.
Common EV Charger Installation Problems We See in North Hills Homes
- The 105°F afternoon breaker trip. A 48-amp charger pulling through a 100-amp panel shared with a central A/C unit will trip the main breaker on the first hot valley afternoon. That leaves the car uncharged overnight and the homeowner confused in the morning.
- Cloth-insulated garage feeders. Many North Hills garages are fed by original 1960s cloth wiring that was never meant for continuous load. It degrades inside the wall before the breaker catches it, which is why LADWP inspectors are strict about this on older ranches.
- Zinsco or Federal Pacific panels. These panels from the 1960s and 70s are still in a surprising number of 91343 homes. LADWP rejects them outright for EV charger permits, so any quote that doesn’t include panel replacement on a pre-1980 home is incomplete.
- Undersized service calculation. An installer uses a generic online load calc instead of LADWP’s specific worksheet, the utility kicks the permit back, and your two-week project becomes a two-month one. We do the LADWP calculation the first time.
Pricing for EV Charger Installation in North Hills, CA
A straightforward Level 2 charger installation in North Hills runs $1,450-$2,200 when the existing panel has spare capacity and the garage is close to the service drop. A Tesla Wall Connector install runs $1,600-$2,500 depending on wire run. Panel upgrade for EV charging is the big variable: $3,200-$4,800 for a 200-amp replacement on an older ranch. Garage and driveway charger wiring with trenching or conduit runs $900-$1,800 in labor and materials depending on distance. We quote upfront, in writing, with no signature wanted tonight. Take two weeks. The price will be the same.
We Also Serve Cities Near North Hills
Our crews serve the whole central and west San Fernando Valley. If you’re in Northridge, Van Nuys, Valley Glen, or San Fernando, we handle EV Charger Installation with the same local knowledge and LADWP familiarity. And if you’re here in North Hills reading this, call us first and we’ll get you scheduled this week.
Serving North Hills, CA - Our Local Coverage Area
We’re based in the North Hills area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in North Hills
Yes, in most North Hills homes built before 1980. The original 100-amp panels from that era, especially Zinsco and Federal Pacific models, are rejected by LADWP inspectors during permit review. If your home still has one of those panels, a 200-amp replacement is required before LADWP will approve the EV charger. Call (877) 550-6892 and we’ll tell you over the phone whether your panel is likely on the flag list.
Yes, and we recommend planning for both at the same time. Because every North Hills home sits in LADWP territory, the solar interconnection queue alone can run 4 to 6 months after permit submission. If you’re thinking about solar within the next few years, size the panel upgrade and the EV circuit for solar from the start. That way you do one permit cycle, one inspection, one electrical upgrade, not two.
Your main breaker will trip on the first hot afternoon when the central A/C and the charger run together. The risk isn’t just inconvenience; the sustained load through aging wiring and breakers that were never built for continuous duty is a heat problem. In a North Hills summer, that heat happens fast. We install load management when the panel is otherwise healthy, or we upgrade the panel when it isn’t. Call (877) 550-6892 for an honest read on yours.
No. A standalone EV charger permit through LADWP is typically processed in one to three weeks, not the 4 to 6 month solar interconnection wait. The pace difference comes from the solar net metering review, which an EV charger alone doesn’t trigger. If you install the charger now and solar later, the charger permit moves on its own timeline. We coordinate both so you’re not paying for a service upgrade twice.
Because the housing stock here is dominated by post-WWII ranch homes built from the late 1940s through the mid-1970s, and many still carry their original 100-amp panels. Add in the fact that a lot of 91343 homes have Federal Pacific or Zinsco panels, which LADWP will not approve for EV loads, and nearly every older ranch needs a panel replacement first. We build that line item into the quote before the first site visit, so there are no surprises.
Have a charger question we didn’t answer? Call (877) 550-6892. A live person picks up, 24/7, and we’ll give you a straight answer about your specific North Hills home. Free estimates, no pressure, and no signature wanted tonight.
Written by Gus Petrakis, Owner at Gus’s Solar, serving North Hills and the San Fernando Valley since 2011.






Before
After
Before
After
Before
After