Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Los Gatos
EV charger installation in Los Gatos typically runs $800 to $2,600 for a standard Level 2 wall unit, with panel upgrades adding $2,500 to $5,000 when your existing service can’t carry the load. Most jobs are done in one visit, and we schedule Los Gatos calls within 48 hours in most cases. If you live up in the hills off Summit Road or along the 95033 corridor near the Santa Cruz Mountains, that changes things: fire-hazard zoning, long service drives, and older panels add work that flatland quotes miss. Call (877) 550-6892 and we’ll give you a straight number before we ever set foot on your property.
Why Gus’s Solar Is Los Gatos’s Preferred EV Charger Installation Company
Gus Petrakis founded this company in 2011 and puts his name on every job we take in Los Gatos. That’s not a slogan. When you call (877) 550-6892, you get a live person, not a voicemail tree. That person can tell you who’s coming, when they’ll be there, and what the work will cost.
We know the difference between a 1920s Craftsman in downtown Los Gatos with a 100-amp fuse panel and a 4,000-square-foot custom estate in 95033 with a 400-amp service and a detached garage 200 feet from the house. Those are different jobs with different permits, different trenching, different design. A technician who only does flatland work in Santa Clara gets lost on a Los Gatos hillside. We don’t.
The 90-Day Done Right Promise applies to every charger we install: if it’s not right, Gus comes back and makes it right. In writing. No fine print, no “subject to availability” hedge.
Our EV Charger Installation Services in Los Gatos
Level 2 Charger Installation
A Level 2 charger on a 240-volt circuit adds 25 to 40 miles of range per hour, which covers the daily commute from Los Gatos to San Jose or up the peninsula with room to spare. We hardwire most units rather than using a plug, which the Town of Los Gatos Building Division generally prefers for garage and exterior installs. Hardwired connections hold up better in the temperature swings we see between the valley floor and the 95033 ridgeline.

Tesla Wall Connector Installation
We install Tesla Wall Connectors regularly across Los Gatos, from the flat east side near Los Gatos Boulevard up to the gated communities off Kennedy Road. Tesla’s unit is straightforward, but the install rarely is, especially when the garage is detached or the panel is on the opposite side of the house. We quote the actual wire run, not a “typical” one.

Panel Upgrade for EV Charging
Here’s what we see constantly in Los Gatos: a 1950s or 1960s ranch home in 95032 with a 100-amp panel, a homeowner who just bought an EV, and a Level 2 charger that trips the main breaker the first night it’s plugged in. Many of those older hillside homes off Quito Road or in the Shannon Road area were built when 100 amps ran an electric dryer and a few lights, not a 48-amp continuous load. A 200-amp panel upgrade is often the only safe path. We include that in the quote up front, not as a surprise change order after we start.

Garage & Driveway Charger Wiring
Los Gatos has more detached garages and longer service drives than most Bay Area cities, especially once you leave the downtown grid and head up into 95033. Trenching from the main panel to a detached garage can add $1,500 to $4,000 depending on distance, soil, and whether we’re going under driveway concrete or open dirt. Flatland installers often leave that line item off the quote. We don’t, because we’ve dug enough trenches in Los Gatos clay and decomposed granite to know what’s involved.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Los Gatos
We work with equipment from EV Charger Installation manufacturers and component brands including Tesla, Enphase, and FranklinWH. If you already have a charger, we service and reconfigure it. If you’re pairing a charger with solar, we model the actual load against your Panasonic or Canadian Solar array so the charger draws power when production is highest and export credits aren’t wasted. We keep common parts stocked for the Los Gatos area, which means fewer second trips when something small fails during a service call.
Common EV Charger Installation Problems We See in Los Gatos Homes
- Undersized panels on older hillside homes. A 100-amp panel from the 1960s can’t absorb a 48-amp Level 2 charger when the AC, dryer, and oven are running. We see the breaker trip the first week and the homeowner calls back frustrated. A panel load calculation before installation prevents this.
- Long trenching runs to detached garages. In 95033, the garage is frequently 75 to 200 feet from the main panel across sloped terrain. Flatland quotes omit this, then the “unexpected” trenching charge appears mid-project. We include it from day one.
- Fire-hazard-zone setback rejections. In Los Gatos’s CAL FIRE Very High Fire Hazard Severity Zones, the charger disconnect must be mounted at a specific distance from the dwelling with documented compliance. Inspectors bounce installs that don’t show this. We know the requirement and design for it before permit submission.
- Marine fog shading reducing solar output. Properties in 95033 that sit under the coastal marine layer get fewer peak production hours than the valley floor. When we pair a charger with solar, we model that specific site, not a regional average, so your solar production estimate actually matches what your charger draws.
Pricing for EV Charger Installation in Los Gatos, CA
Here are real numbers for the Los Gatos market, not brochure figures:
- Standard Level 2 wall unit installation (hardwired, garage, panel nearby): $800-$1,400
- Tesla Wall Connector installation (typical detached garage with short conduit run): $1,200-$2,200
- Trenching for detached garage or driveway charger (per 50 feet, open dirt): $750-$1,600
- 200-amp main panel upgrade (including permit, labor, materials): $2,800-$5,200
- Solar-paired EV charger with load management and off-peak configuration: $1,800-$3,100
What moves the price in Los Gatos specifically: fire-hazard-zone setbacks in 95033, trenching distance in rural parcels, panel age and existing service size, and whether the garage is attached or detached. We don’t want a signature tonight. Bring us a bill, we’ll bring you the math. Take two weeks. The price will be the same.
We Also Serve Cities Near Los Gatos
In addition to Los Gatos, our team covers Saratoga, Campbell, Communications Hill, and San Jose. If you’re just over the border and wondering whether we’ll come out, call and ask. We serve the broader Los Gatos area with the same Los Gatos standard: straight answers, one trip, done right.
Serving Los Gatos, CA - Our Local Coverage Area
We’re based in the Los Gatos area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Los Gatos
Most likely yes. A Level 2 charger pulling 32 to 48 amps on a 100-amp panel leaves almost no room for anything else, and in Los Gatos homes built in the 1950s and 1960s, the panels are often at or near capacity already. The answer depends on your specific load calculation, which we run before quoting. Call (877) 550-6892 and we’ll tell you what your panel can handle, free.
If your property falls within the CAL FIRE Very High Fire Hazard Severity Zone, which covers much of 95033 and upper 95030, the charger disconnect must be mounted at a specific distance from the dwelling with fire-department access considered. The Town of Los Gatos Building Division requires explicit documentation of this in the permit package. We design for it before submission, so you don’t get a rejection letter after three weeks of waiting.
Yes, and it’s the smartest financial move for most Los Gatos EV owners. We configure the charger to draw power when your Panasonic or Canadian Solar array is producing at peak, which maximizes your true-up statement credits instead of pulling grid power at the highest time-of-use rate. This is especially important on hillside properties in 95033 where reduced sun hours from marine fog make smart scheduling essential. Call (877) 550-6892 for a quote built off your actual utility bill.
Plan on two to six weeks depending on whether your property is in the fire hazard zone. The Town of Los Gatos Building Division is known among local contractors for rigorous plan-check review, especially on hillside permits where NEC 690.12 rapid-shutdown compliance and fire-department setbacks must be documented precisely. We submit complete plans the first time, which keeps the timeline at the shorter end of that range.
Most detached garages in Los Gatos need some trenching, and on rural 95033 parcels the run can be 75 to 200 feet. Trenching typically adds $750 to $1,600 per 50 feet depending on terrain and whether we’re crossing driveway concrete. We include that in the quote up front. Call (877) 550-6892 and we’ll walk you through what your specific lot requires.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Los Gatos and the surrounding Bay Area communities since 2011.






Before
After
Before
After
Before
After