Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Kirby
If you live in Kirby and you’re tired of the 3-amp trickle charger that came with your EV, here’s the straight answer: a professionally installed Level 2 charger in Kirby runs $850-$2,400 depending on your panel and where the charger sits, and our crew can usually have it done in one day. Gus’s Solar has been pulling permits and running wire through Kirby’s municipal offices for years. We know exactly which desk to call at Kirby City Hall, and that’s the difference between charging tonight and waiting three weeks on a permit that got filed in the wrong city. Call (877) 550-6892 for a free estimate.
Why Gus’s Solar Is Kirby’s Preferred EV Charger Installation Company
Kirby is one of those places where the address says Kirby but half the contractors still write “San Antonio” on the permit. That mistake costs homeowners weeks. We don’t make it. Gus Petrakis puts his own name on every job, answers his own phone, and knows the difference between a Kirby permit and a CPS Energy interconnection application because he has been doing this since 2011. When you call, you get a live person. Not a voicemail, not a call center in another state.
Our EV Charger Installation team works in Kirby every week. The homes here are mostly mid-century ranchers with original 100-amp panels, and the charger jobs follow a pattern. That’s good for you. It means we can look at your setup, quote a real number off the actual panel and the actual distance to the garage, and tell you honestly whether you need a service upgrade before you spend anything. No pressure, no “sign tonight” pitch. Take two weeks. The price will be the same.
Our EV Charger Installation Services in Kirby
Level 2 Charger Installation
A hardwired Level 2 charger on a 40-amp or 48-amp circuit will add 25-40 miles of range per hour in Kirby, which is what most EV owners actually need. We mount the unit, run the circuit from your panel, and leave the job clean. In Kirby’s 1960s-70s homes, the panel is usually in a hallway closet or the back of the house, so the run to the garage is short but the panel itself is often maxed out. We’ll tell you upfront if that’s the case.

Tesla Wall Connector Installation
We install Tesla Wall Connectors in Kirby garages and detached workshops regularly. The unit itself is solid, but it pulls a continuous 48 amps on a 60-amp breaker. Many Kirby homes cannot support that on the existing 100-amp electrical panel. Before we schedule, we’ll look at your panel rating, count your existing breakers, and tell you exactly what will work. If your panel is full, we install a subpanel or upgrade the service. You’ll know the number before we touch anything.

Panel Upgrade for EV Charging
This is the most common add-on in Kirby, and the one that catches out-of-area installers. If your home still has its original 100-amp panel from the 1960s or 70s, a 48-amp charger plus air conditioning plus a dryer simply won’t fit. We upgrade to 200-amp service. Gus’s crew does the work; it’s not subcontracted. A panel upgrade in Kirby runs $2,800-$5,500 depending on the panel location, the meter, and whether Kirby requires a service drop relocation. We’ll tell you exactly what Kirby’s inspector will look for.

Garage & Driveway Charger Wiring
Kirby lots are small, but plenty of homes have detached garages or workshops set back from the house. Running a new 240V circuit to a detached structure means buried conduit, a subpanel, and a separate permit from Kirby City Hall. We handle all of it. On a 1970s rancher along Ackerman Road, our crew installed a Tesla Wall Connector in the owner’s detached garage. The original 100-amp panel was full and the service drop landed mid-attic, so we ran a 60-amp feeder through buried conduit to the garage. Kirby required a separate garage subpanel permit before we could set the charger. Two same-day inspections later, the homeowner was charging that night. That’s how the same-day promise works in Kirby: you file the right papers with the right city.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Kirby
We install and wire chargers for every major EV brand, including Tesla, Rivian, Ford, Chevrolet, Hyundai, and Kia. When the job calls for a battery or system that pairs with the charger, we work with FranklinWH, Panasonic, and Canadian Solar among others. What matters for Kirby homeowners is that we stock the breakers, conduit, disconnects, and charger mounting hardware needed for the homes here, which means we don’t have to make a second trip for a part. If you’re planning Kirby Solar Panel Installation later, we’ll size the panel and the charger circuit so both systems share the panel cleanly from day one.
Common EV Charger Installation Problems We See in Kirby Homes
- Permit filed with the wrong city. Kirby is not served by San Antonio’s Development Services, but contractors unfamiliar with the area file there anyway. The permit sits for weeks, then gets rejected. We file with Kirby City Hall directly, the first time.
- Original 100-amp panel already full. Most mid-century Kirby homes never had room for a 240V EV charger. Before we quote the charger, we check whether you need a 200-amp upgrade or a subpanel. No surprises on install day.
- Detached workshop fed with undersized aluminum. Lots of Kirby homes have a workshop or detached garage wired decades ago with 10-gauge aluminum. That cannot carry a 48-amp continuous load. We replace the feeder, and we’ll tell you if the old wire is reusable for a smaller circuit or not.
- Charger purchased before the panel was checked. Someone buys a 48-amp charger online, then finds out the panel only has room for a 30-amp breaker. Call us before you buy. We’ll tell you what your home can actually support for free.
Pricing for EV Charger Installation in Kirby, TX
Here are real numbers for Kirby, not brochure ranges. A standard Level 2 charger install with a short conduit run from a panel that has open slots runs $850-$1,500. A Tesla Wall Connector on a 60-amp circuit in an attached garage runs $1,200-$1,900. If your home needs a 200-amp service upgrade first, the combined job runs $3,800-$7,000 including the panel, meter work, and charger circuit. A detached garage or workshop add-on works like the Ackerman Road job: the buried conduit, subpanel, and separate Kirby permit typically add $2,200-$3,800 to the base install. Every quote is built off your actual panel and your actual garage, and the number we quote is the number you pay. Call (877) 550-6892 for a free estimate.
| EV Charger Service in Kirby | Typical Price Range |
|---|---|
| Level 2 charger install, attached garage, open panel slots | $850 - $1,500 |
| Tesla Wall Connector, 60-amp circuit, attached garage | $1,200 - $1,900 |
| 200-amp panel upgrade + charger circuit | $3,800 - $7,000 |
| Detached garage/workshop charger with subpanel and buried conduit | add $2,200 - $3,800 |
We Also Serve Cities Near Kirby
We install EV chargers throughout the Kirby area and nearby communities. If you’re in Windcrest, Converse, Live Oak, or Universal City, we cover your neighborhood too. For more on our full-service area, see our Kirby service page. Dispatch and scheduling are coordinated from our San Antonio office; the crews serve Kirby locally.
Serving Kirby, TX - Our Local Coverage Area
We’re based in the Kirby area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Kirby
You need a permit from Kirby City Hall, not San Antonio. Kirby is an independent municipality fully surrounded by San Antonio, and it runs its own building permits. Some contractors mistakenly file through San Antonio or CPS Energy, which delays the job. We file with the correct office in Kirby the first time. Call (877) 550-6892 and we’ll handle the paperwork.
Probably not. A 48-amp charger pulls a continuous load that leaves almost no capacity for air conditioning, a dryer, or anything else on a 100-amp panel. Most 1960s Kirby homes need a 200-amp service upgrade before the charger can be safely installed. We’ll inspect your panel for free and tell you exactly what’s required. If you don’t need the upgrade, we won’t sell you one.
Yes. Detached workshop chargers are one of the most common setups we install in Kirby. The job requires a buried conduit run from the house panel, a subpanel in the workshop, and a separate permit from Kirby City Hall for the detached structure. We run the feeder, pull the permit, and handle both inspections. Most detached workshop installations add $2,200-$3,800 to the base charger cost.
Yes, and it should be planned that way from the start. We size the charger circuit and the panel with future solar in mind. Many Kirby homeowners add panels later, and pairing a charger with EV Charger Installation and solar means your car charges from the sun instead of the grid. We can wire the charger now so a future solar backup battery like FranklinWH integrates cleanly. If you’re thinking solar in the next few years, mention it when you call.
Kirby sits in Texas hail alley, and the homes here get hit by spring hailstorms that crack standard panels. If you’re adding a solar array to power your EV charger, Solar Panel Repair in Kirby is something our team knows well, and a Class 4 impact-rated panel is worth the difference. The charger itself is indoors and unaffected, but the panels feeding it need to survive Kirby’s specific weather. Gus’s team has been through enough hail seasons in this ZIP code to know what holds up. Call (877) 550-6892 and we’ll talk straight about what you need.
We serve all of 78244, including the neighborhoods along Ackerman Road, Binz-Engleman, and the blocks around Kirby Middle School. For most estimates, we can be out the same week. For a charger install that doesn’t need a panel upgrade, same-day or next-day scheduling is common. Call (877) 550-6892 and ask. A live person answers, day or night.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Kirby and the surrounding area since 2011.






Before
After
Before
After
Before
After