Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Everman
If you live in Everman and drive an EV, you already know the frustration of public charging. It’s slow, it’s out of the way, and it doesn’t match how you actually use your car. A Level 2 charger in your own garage or driveway solves that. We install EV chargers in Everman every week, most jobs done in a single day. Our crews know the 76140 housing stock, the panel situations in these 1950s and 60s homes, and what Oncor wants before we ever pull a permit. Call (877) 550-6892 and we’ll give you a straight answer on what your house needs.
Why Gus’s Solar Is Everman’s Preferred EV Charger Installation Company
Gus Petrakis founded this company in 2011 and he still puts his own name on every job we quote. That’s not marketing. It’s how we’ve worked for over 29 years as a local shop. When you call about EV Charger Installation in Everman, you talk to a person who knows this area, not a call center. You get a crew that leaves the job site clean, does the wiring to code, and doesn’t disappear after the invoice clears.
Everman homeowners tell us the same thing: they’re tired of slick sales pitches from out-of-state installers who quote one number on the phone and a different one at the door. We don’t play that game. The price we quote is the price you pay. Gus tells every customer the same thing: take two weeks, think about it, and the number will be exactly the same. If a salesman needs your answer tonight, the answer is no.
Our EV Charger Installation team serves Everman with background-checked, uniformed techs on every job. A live person answers our phone 24/7. Not a voicemail. Not a ticketing portal. When a charger stops working at 10 p.m. on a Friday, you call and a human picks up.
Our EV Charger Installation Services in Everman
Everman homes need more than a bracket on the wall. These houses were built for a different electrical era, and we treat them accordingly. Here’s what we handle most often in 76140.
Level 2 Charger Installation
A Level 2 charger is what most Everman homeowners need. It adds 25 to 30 miles of range per hour, which means your car is full every morning. In Everman’s 1950s and 60s ranches, the install usually means running a dedicated circuit from your panel to the garage or carport. We assess your panel capacity first, because many of these homes have 60- or 100-amp service that won’t support a 48-amp charger without tripping the main.

Tesla Wall Connector Installation
If you drive a Tesla, the Wall Connector is the cleanest setup. We install them in Everman garages and carports regularly. The unit is hardwired, which means no outlet to melt or arc. On older Everman homes, this often pairs with a panel upgrade. We just finished one off Enon Avenue in 76140 where the customer’s 1972 ranch had a 100-amp Murray panel already maxed out by central AC and an electric dryer. We pulled the old panel, set a new 200-amp main with a dedicated 60-amp breaker, and ran 6/3 copper through the attic to a wall-mounted connector by the carport. Oncor approved the meter-socket upgrade, city inspection walked off the bonding and torque specs, and now she charges her Model 3 overnight while the solar covers the added load. That’s the job done right.

Panel Upgrade for EV Charging
This is the most common service we perform in Everman. A 60- or 100-amp panel cannot handle a modern Level 2 charger when the AC is running on a hot August evening. The main breaker trips, the charger faults, and you’re stuck with a car that won’t charge. We replace the panel with a 200-amp service and run a dedicated circuit for the charger. It’s a bigger job than just hanging a unit on the wall, but it’s the difference between safe charging and a constant headache.

Garage & Driveway Charger Wiring
Everman homes have detached garages, carports, or driveways where the charger has to run outside. That means conduit, weatherproofing, and wire sized for distance and load. We’ve run chargers 60 feet from the house to a driveway post more times than we can count in this town. The key is doing it to code the first time, with proper grounding and the right conduit so it survives a Texas summer and a hailstorm.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Everman
We work with equipment from Tesla, Enphase, SolarEdge, SunPower, Panasonic, Qcells, REC, Canadian Solar, JinkoSolar, and FranklinWH. If you already have a Qcells or REC solar system on your Everman roof, we can match your EV charger to that equipment so the monitoring talks to one system. SunPower inverters pair particularly well with whole-home battery backup in North Texas, but we’ll tell you straight which brand makes sense for your house, not which one we have a quota to move.
Common EV Charger Installation Problems We See in Everman Homes
- Undersized 60- or 100-amp panels. The main breaker trips every time the charger pulls 48 amps while the AC is running. This is the single most common issue in Everman and almost always requires a panel upgrade before anything else.
- Oncor meter-socket delays. Everman has no municipal utility, so everyone is on Oncor’s distribution grid under TDU tariffs. The meter-socket upgrade process is separate from the city permit and routinely adds weeks to a project. If your installer doesn’t know Oncor’s paperwork, you’ll be sitting with a dead charger and no answers.
- Post-hail roof damage getting missed. We’ve had panel removals for service rewiring that revealed a failing roof deck the homeowner never noticed. That kind of damage voids warranties and turns a simple charger install into a roofing project. We check before we cut.
- Unpermitted charger installs. Hiring an electrician who doesn’t pull the Everman permit and coordinate with Oncor leaves you with a charger that’s not code-compliant. If something goes wrong, your insurance will look for any reason to deny the claim. Permits matter.
Pricing for EV Charger Installation in Everman, TX
A straight Level 2 charger install on an Everman home with adequate panel capacity typically runs $600 to $1,200. If you’re adding a Tesla Wall Connector, expect $800 to $1,500 depending on how far the wiring has to run from the panel. A panel upgrade to 200 amps, which most 1950s and 60s Everman homes need, runs $2,500 to $4,000 including Oncor coordination. A combined panel upgrade and charger install lands between $3,000 and $5,500 for most 76140 houses. We give free estimates, and we honor them. Call (877) 550-6892 and we’ll walk your house, look at your panel, and hand you a number with no signature demanded.
We Also Serve Cities Near Everman
Our crews work Everman and the surrounding communities every week. That includes Rendon, Kennedale, Forest Hill, and Burleson. If you’re down 1187 toward Rendon or off 287 in Burleson, the drive time is short and the pricing doesn’t change for being across a city line. Same crew, same standards, same phone number.
Serving Everman, TX - Our Local Coverage Area
We’re based in the Everman area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Everman
If your Everman home was built between the 1950s and 1970s and still has a 60- or 100-amp panel, you almost certainly need an upgrade to 200 amps before a Level 2 charger will work safely. The charger pulls 48 amps and your AC, dryer, and oven are already competing for that capacity. Call (877) 550-6892 and we’ll check your panel in person before you spend a dollar.
Everman has no municipal utility, so every meter-socket change goes through Oncor’s TDU process, which is a separate queue from the city’s building inspection. That adds anywhere from one to four weeks depending on Oncor’s backlog. We handle that paperwork from start to finish and we’ll tell you the timeline upfront, not after you’ve already paid.
Yes, and it’s the smartest way to charge. A Qcells or REC solar array sized for your actual usage can offset the added load of an EV, often bringing the payback period under six years. For hail, we recommend panels with IEC 61215 Class 3 impact ratings, which is the standard for surviving the golf-ball-sized hail Everman sees multiple times per decade. We’ll show you the exact panel specs before you sign anything.
It starts with a panel assessment. A 1960s Everman home typically has a 60- or 100-amp panel that needs upgrading to 200 amps. Then we run a dedicated 60-amp circuit, hardwire the Wall Connector, and coordinate the Oncor meter-socket change and city inspection. The whole job usually takes one to two days on our end, plus the Oncor wait time. Call (877) 550-6892 for a free estimate.
It can. If your roof deck has hidden hail damage and we need to remove a panel area to run wiring, that damage gets exposed and can void your existing warranty. We’ll inspect before we start and tell you exactly what we see. Better to know now than to find out during a warranty claim later.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Everman since 2011.






Before
After
Before
After
Before
After