Free bill analysis - bring a power bill, get the production math for your actual roof, panel brands like Qcells and REC compared side by side
If the pitch starts at your door and ends with "sign tonight for the special," sleep on it. The sun will still be there tomorrow; so will we.
Fast, Reliable EV Charger Installation Across Clovis
If you live in Clovis and you’re tired of hunting for public chargers or waiting overnight on a 120-volt trickle, a Level 2 charger at home is the fix. We install EV chargers in Clovis every week, from the old growth neighborhoods off Gettysburg to the newer builds out near Harlan Ranch. Our crew knows the local panel setups, the PG&E paperwork quirks, and which installs will pass inspection the first time. Call (877) 550-6892 and you’ll get Gus or one of his own people on the line, not a call center.
Most Clovis installs take half a day. The charger goes on the wall, the circuit gets pulled, the breaker lands, and your car is charging before dinner. We quote a real number up front, and that’s the number you pay.
Why Gus’s Solar Is Clovis’s Preferred EV Charger Installation Company
Gus Petrakis started Gus’s Solar in 2011, and his name is on the truck, the license, and the work. That matters in Clovis, where a lot of homeowners have been burned by out-of-state outfits that quote one number in the driveway and a different one at the door. Gus doesn’t do that. Bring us your actual utility bill, and we’ll build your charger math off your real usage, not a brochure.
Our EV Charger Installation team serves Clovis daily. We know the 100-amp panels in 93611 and 93612 homes. We know the clay soil in 93619 and what it does to conduit. We know which Clovis inspectors want to see a rapid shutdown label on solar-paired chargers and which ones won’t pass an install without an expansion joint on above-grade conduit runs. That’s the kind of local knowledge you can’t get from a national call center.
Every install is backed by the 90-Day Done Right Promise in writing. If it’s not right, Gus makes it right. And a live person answers our phone 24/7. That’s not a perk. It’s how we’ve stayed in business this long.
Our EV Charger Installation Services in Clovis
Level 2 Charger Installation
A Level 2 charger in Clovis typically adds about 25 to 35 miles of range per hour of charging, which covers most commutes overnight. We handle the full install: dedicated 240-volt circuit, breaker, wiring, wall mounting, and the final hookup. Most homes in 93612 and 93613 have plenty of room in the panel if you’ve got a 200-amp main, but we’ll verify before we quote anything.

Tesla Wall Connector Installation
We install a lot of Tesla Wall Connectors in Clovis, and there’s a reason. The Gen 3 unit pulls up to 48 amps and integrates cleanly with the Tesla app. Last month we rerouted a 60-amp circuit in a 93611 garage on Gettysburg Avenue after the original installer left the Tesla Wall Connector’s rapid shutdown wiring buried under 24 inches of attic insulation. Our tech pulled a new branch, relabeled the subpanel’s azimuth labels, and had the car charging at 11.5 kW by 2 p.m.

Panel Upgrade for EV Charging
The most common call we get in Clovis is a 100-amp panel that trips when a Level 2 charger and a central AC run together on a summer afternoon. It happens constantly in the older 93611 tract homes. If your main is undersized, we’ll upgrade it to 200 amps, land the charger circuit, and coordinate with PG&E if a service upgrade or meter swap is required. We give you a straight answer on whether a load calculation supports the charger without the upgrade, because sometimes it does and you don’t need to spend the money.

Garage & Driveway Charger Wiring
Clovis garages tend to be attached, which makes for straightforward charger runs. Driveway installs across 93619 are a different story. The clay soil movement in that part of Clovis will crack rigid conduit that’s run above grade without a listed expansion joint. We already know this, so we spec the joint from the start and the inspection passes. If you need a pedestal mount or a long run from the panel to the driveway, we’ll run the wire the right way the first time.

Solar-Paired EV Charging
This is where our solar background saves you money. If you already have panels on your Clovis roof, we can pair your charger with your system so you’re fueling your car off your own production instead of buying every kilowatt from PG&E. That’s a real difference on your true-up statement, especially on the east side of Clovis where net metering credits and interconnection requirements work differently than the neighboring municipal utilities. We handle the paperwork, the labels, and the documentation so PG&E field checkers sign off without stalling your install.

Commercial EV Charging Stations
We also install commercial level 2 and DC fast charging in Clovis, from small office lots to multi-unit properties. The permitting path in Clovis is different than what you’d face across the county line in Fresno, and we know what the city wants to see before we pull the permit. If you’re a property owner weighing a commercial charger, call us for a straight read on cost and timeline.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Clovis
We install and service chargers from Tesla, Enphase, and SolarEdge. We keep common Tesla Wall Connector faceplates, mounting hardware, and Enphase components stocked locally so Clovis customers aren’t waiting on a part from a warehouse in Ohio. If your charger came with your solar system or you’re adding one to a system we installed, we’ll make the integration seamless without a third-party middleman.
Common EV Charger Installation Problems We See in Clovis Homes
- Undersized 100-amp panels in 93611 and 93612. A Level 2 charger and a central AC running together on a summer afternoon will trip a 100-amp main. We see this weekly. The fix is usually a 200-amp panel upgrade or a load-managed charger that throttles when the house draws heavy current.
- Missing rapid shutdown labels on solar-paired chargers. PG&E field checkers in Clovis are strict about this. If your existing microinverters lack a rapid shutdown label, the interconnection paperwork stalls and your charger sits dead. We know exactly what label goes where, and we fix it before the inspector arrives.
- Failed driveway inspections in 93619. Clay soil movement cracks rigid conduit run above grade without a listed expansion joint. Inspectors in this part of Clovis look for it. We spec the joint from the beginning so the permit passes the first time.
- Chargers wired off a subpanel that wasn’t built for the load. In older Clovis garages, we regularly find subpanels that were fine for a 15-amp freezer but not for a 48-amp charger. We pull a fresh branch from the main panel and label the subpanel correctly.
Pricing for EV Charger Installation in Clovis, CA
A standard Level 2 charger install in Clovis typically runs $450 to $900 when the panel has capacity and the charger is a straightforward wall mount. A Tesla Wall Connector install falls in the same range, with the charger itself adding $450 to $550 if you haven’t bought one yet. If you need a panel upgrade from 100 to 200 amps, that’s usually $2,800 to $4,200 depending on whether PG&E needs to swap the meter or drop a new service. Solar-paired charger wiring with rapid shutdown documentation adds $600 to $1,200 on top of the base install, depending on your existing system’s age and inverter type. Estimates are free. Bring us a bill, we’ll bring you the math.
We also run a Senior and Veteran 10% discount that never expires, and if you have a written estimate from another shop, we’ll take a free second look. The price we quote is the price you pay. No signature wanted tonight.
We Also Serve Cities Near Clovis
While this page covers EV Charger Installation in Clovis, our crews also serve Fresno, Old Fig Garden, Sanger, and Fowler. If you’re just over the line or a few miles out, the same crew comes out. Same pricing. Same Done Right Promise.
Serving Clovis, CA - Our Local Coverage Area
We’re based in the Clovis area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - EV Charger Installation in Clovis
Under PG&E’s net metering in Clovis, every kilowatt-hour your solar system sends to the grid earns a credit, and your EV charger draws from that bank at night or on cloudy days. If your system was sized before you bought an EV, your charger will pull more than the system offsets on some months, which pushes your true-up into a bill instead of a credit. The payback on a solar-paired charger depends on your system’s excess production and your driving mileage. We’ll read your true-up statement and tell you exactly what the charger does to your bottom line before you spend a dollar. Call (877) 550-6892 and Gus will walk the numbers on your actual bill.
Yes, it will. The Tesla Wall Connector draws load off your panel, and your Enphase microinverters push solar into the same panel. They don’t talk to each other, so compatibility isn’t the issue. The issue in 93612 is the rapid shutdown labeling PG&E wants to see on the solar side when you add a charger circuit to a home with microinverters. We handle that documentation before the inspection. If your Enphase system is older, we may need to verify the inverter’s shutdown trigger still meets current code.
Maybe not. A 100-amp main with gas appliances often has enough headroom for a 30-amp or 40-amp charger circuit, especially if the house doesn’t have central AC or the AC is a newer high-efficiency unit. We run a load calculation on your actual panel before we recommend an upgrade. If the calc says the 100-amp main is fine, we’ll install the charger on the existing panel and you save the upgrade cost. Call (877) 550-6892 for a free load calc and estimate.
Clovis has its own city permitting office and its own inspectors, so the submittal requirements, fees, and turnaround times differ from Fresno’s. In Clovis, the city wants a stamped site plan and a load letter from the utility before the permit is issued, which most commercial operators don’t realize until their application stalls. We know the Clovis process and can pull the permit without burning your timeline. For a commercial charger in Clovis, expect the project to run $6,000 to $18,000 depending on the charger type, trenching, and panel capacity.
It depends on the route from your panel to the driveway. If the panel is in the garage on the driveway side, we can often run conduit along the exterior wall and set a pedestal without any trenching. If the panel is on the opposite side of the house, we need to trench. The key detail in 93619 is the expansion joint. The clay soil moves, and an inspector in that ZIP will fail an above-grade conduit run without a listed expansion joint. We build it in from day one.
Written by Gus Petrakis, Owner at Gus’s Solar, serving Clovis, CA.






Before
After
Before
After
Before
After